Skip to content

Planning application · FAL/P/26/0163/FUL

FAL/P/26/0163/FULDecidedWorth watching

Biomass plant proposed at Walker Timber in Bo’ness.

Walker Timber Carriden Mills Bridgeness Road Bo'ness EH51 9SQ

Bo'ness and Blackness ward · Falkirk Council

Preview alerts near this site

Free preview. £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Small 3/10
Tags
  • Biomass Energy
  • Industrial Logistics
  • Renewable Energy Infrastructure

Overview

Why it’s worth watching

The proposal is a material industrial and renewable-energy installation with visible new equipment and potential local environmental and operational consequences.

Today
Timber manufacturing facility
Proposed
Biomass plant installation
Size
0.11 ha site area
Stage
Decided on 3 Jul 2026: Grant Planning Permission.

The council writes only to properties within 20 metres of an application site. Who is told

(approved 08) proposed site plan

In plain English

The application was for a biomass plant at Walker Timber, where the current use is timber manufacturing. Falkirk Council granted planning permission. The applicant had earlier sought pre-planning advice under reference 25/0088/PAA.

Written with AI from the application form and the council record.

Keep reading

Track this application

How do I track planning application FAL/P/26/0163/FUL?

Follow it on City Scope. This page is checked against the Falkirk Council planning register and shows the latest status, decision and documents for FAL/P/26/0163/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Falkirk Council planning portal.

Set up a planning alert