Application FIF/19/02750/NMV1
Ferrymuir Energy Battery Storage Stratheden Cupar Fife KY15 5RW
Non-material variation to augment battery storage, adding 12 DC containers and extending bases.
The record
- Reference
- FIF/19/02750/NMV1
- Address
- Ferrymuir Energy Battery Storage Stratheden Cupar Fife KY15 5RW
- Status
- Registered
- Category
- New-Build & Major Development
- Impact scale
- 5/10
- Authority
- Fife Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 56.3104
- Longitude
- -3.0426
What is proposed
Plain-language summary
Non-material variation to augment battery storage, adding 12 DC containers and extending bases.
As filed with the council
Proposed erection of battery storage compound (49.9MW) comprising of containerised battery storage units and installation of boundary fence and associated works (increase in capacity from 19.99MW permitted under 18/02245/FULL) (Non-Material Variation to reflect the augmentation of the existing Ferrymuir Battery Energy Storage System from a one-hour to a two-hour configuration. he proposed variation comprises the extension of existing concrete battery bases, the repositioning and consolidation of existing battery racks, and the installation of 12 additional DC battery containers on the vacated battery-unit bases. The revised arrangement retains the existing maximum import and export capacity of 49.9 MW to planning permission 19/02750/FULL)