Planning application · FIF/19/02750/NMV1
Changes to approved 49.9MW battery storage scheme at Ferrymuir.
Ferrymuir Energy Battery Storage Stratheden Cupar Fife KY15 5RW
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
Preview similar trade leads
- Renewable Energy, EV & Heat Pumps
- Medium 5/10
- Associated Infrastructure
- Boundary Treatment
- House Extension
- Substation
Overview
Why it’s worth watching
This is a specific change to an existing battery project: the application describes a longer-duration configuration while keeping the stated maximum import/export capacity unchanged. No MWh rating or decision is established in the inspected evidence.
- Today
- The approved system has a one-hour configuration.
- Proposed
- A two-hour configuration, with the maximum import and export capacity remaining 49.9 MW.
- Size
- 49.9 MW maximum import and export capacity
- Stage
- Decided on 27 Oct 2026: Application Permitted - no conditions.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This application changes details of the already-approved Ferrymuir battery storage scheme under reference 19/02750/FULL. It changes the system from a one-hour to a two-hour configuration, while retaining the approved maximum import and export capacity of 49.9 MW. The council permitted the application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.
Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application FIF/19/02750/NMV1?
Follow it on City Scope. This page is checked against the Fife Council planning register and shows the latest status, decision and documents for FIF/19/02750/NMV1. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Fife Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Existing concrete battery bases would be extended and battery racks repositioned and consolidated.
- 02
12 additional DC battery containers would be installed on vacated battery-unit bases.
Questions
What earlier permission does this relate to?
The application changes the approved scheme under reference 19/02750/FULL.
What was the decision?
The application was permitted.
Tags
- Boundary Treatment
- House Extension
- Associated Infrastructure
- Substation
What each tag is based on
- Associated Infrastructure
- “installation of boundary fence and associated works”
- Boundary Treatment
- “installation of boundary fence”
- House Extension
- “extension”
- Substation
- “extension of existing concrete battery bases”, “installation of 12 additional DC battery containers”
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 27 October 2026.
- Received10 Aug 2026
- Validated10 Aug 2026The council has everything it needs.
- Comments closed31 Aug 2026Usual deadline. Late comments may still count.
- Target decision10 Oct 20262-month target for local developments.
- Decision27 Oct 2026Application Permitted - no conditions.
The record
- Reference
- FIF/19/02750/NMV1
- Address
- Ferrymuir Energy Battery Storage Stratheden Cupar Fife KY15 5RW
- Status
- Decided
- Council decision
- Application Permitted - no conditions
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- Fife Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Cupar
Discussion
Talk about this application.