Planning applicationFIF/24/00284/NMV1

Land East Of Canmore Primary School Aberdour Road Dunfermline Fife

DecidedWorth watchingNew-Build & Major Development
Official records · coverage in progress

2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.

Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

23 June 2025

Validated

4 July 2025

Planning Signals

11 detected traits

Use
Education
Specific
Access ChangesAffordable HousingCar ParkingClass 8 Residential EducationDrainage Wastewater Infrastructure
AI summary

Proposed 40-home sheltered housing scheme would include access, parking, footpaths, retaining walls, landscaping, drainage and renewable energy changes.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application FIF/24/00284/NMV1

Land East Of Canmore Primary School Aberdour Road Dunfermline Fife

DecidedNew-Build & Major DevelopmentReceived Fife Council

Proposed 40-home sheltered housing scheme would include access, parking, footpaths, retaining walls, landscaping, drainage and renewable energy changes.

Reference
FIF/24/00284/NMV1
Address
Land East Of Canmore Primary School Aberdour Road Dunfermline Fife
Status
Decided
Category
New-Build & Major Development
Impact scale
8/10
Authority
Fife Council
Received
Validated
Last scraped
Record created
Latitude
56.0603
Longitude
-3.4263

Plain-language summary

Proposed 40-home sheltered housing scheme would include access, parking, footpaths, retaining walls, landscaping, drainage and renewable energy changes.

As filed with the council

Erection of 40.no affordable flatted dwellings for sheltered housing needs (Class 8) including formation of new access/car parking and footpaths, retaining walls and boundary enclosures with associated landscaping, drainage, renewable energy infrastructure and ancillary works (Non Material Variation to reduce retaining wall height, adjust site levels adjacent to top of retaining wall and amend road layout within site to 24/00284/FULL)