Planning application · FIF/25/01855/CON
360 megawatt battery storage system near Kinglassie.
Scottish Government Consultation Fife
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Brownfield Site
- Eia Screening
- Renewable Energy Infrastructure
Overview
Why it’s worth watching
A 360MW battery energy storage system proposed on the former Westfield opencast coal site is a major energy infrastructure proposal with clear regional consequence.
- Proposed
- A 360 megawatt battery energy storage system and associated infrastructure
- Size
- 360 megawatt (MW) battery storage capacity
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks a screening opinion on a 360 megawatt battery energy storage system and associated infrastructure. The proposed site is previously developed land at the former Westfield opencast coal site, near Kinglassie.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.
Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application FIF/25/01855/CON?
Follow it on City Scope. This page is checked against the Fife Council planning register and shows the latest status, decision and documents for FIF/25/01855/CON. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Fife Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A battery energy storage system and associated infrastructure are being considered for the site.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Brownfield Site
- Eia Screening
- Renewable Energy Infrastructure
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Brownfield Site
- “on previously developed land at the former Westfield opencast coal site”
- Eia Screening
- “Screening opinion on 360 megawatt (MW) battery energy storage system”, “ECU00006213”
- Renewable Energy Infrastructure
- “battery energy storage system and associated infrastructure”, “360 megawatt (MW)”
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received26 Jun 2025
- Validated26 Jun 2025The council has everything it needs.
- Comments closed17 Jul 2025Usual deadline. Late comments may still count.
- Target decision26 Aug 20252-month target for local developments.
- DecisionDecided
Linked applications (3)
Planning terms
- Conservation area consent
- Needed to demolish a building in a conservation area. Decided alongside any planning application.
The record
- Reference
- FIF/25/01855/CON
- Address
- Scottish Government Consultation Fife
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Fife Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.





