Planning application · FIF/25/02549/SCR
1MW solar farm and battery storage proposed near Glenrothes.
Lochty Meadows Site To The East Of Blackwood Road Glenrothes Fife
Free with a City Scope account. One email, when the council decides.
Also email me new applications in this council · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Eia Screening
- Renewable Energy Infrastructure
- Substation
Overview
Why it’s worth watching
The proposal would introduce renewable energy generation and battery storage infrastructure at a specific greenfield site, a material land-use change, though it is currently only at the screening stage and no application form is available.
- Proposed
- A 1MW solar farm and battery storage facility with associated infrastructure
- Size
- 1 MW solar farm capacity
- Stage
- Past its target date of 9 Nov 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application asks Fife Council to screen a proposed 1MW solar farm and battery storage facility, with associated infrastructure, to decide whether an Environmental Impact Assessment is required. An Environmental Impact Assessment is a detailed study of a development’s potential environmental effects. The application does not itself seek permission for the solar farm.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.
Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application FIF/25/02549/SCR?
Follow it on City Scope. This page is checked against the Fife Council planning register and shows the latest status, decision and documents for FIF/25/02549/SCR. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Fife Council planning portal.
Set up a planning alertThe impact
What it involves.
Questions
What does this application decide?
It asks whether an Environmental Impact Assessment is required for the proposed development. It is a screening request, not an application for permission to build.
Tags
- Associated Infrastructure
- Eia Screening
- Renewable Energy Infrastructure
- Substation
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Eia Screening
- “EIA Screening Request for proposed 1MW solar farm and battery storage facility with associated infrastructure”
- Renewable Energy Infrastructure
- “EIA Screening Request for proposed 1MW solar farm and battery storage facility with associated infrastructure”
- Substation
- “with associated infrastructure including substations”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received9 Sept 2025
- Validated9 Sept 2025The council has everything it needs.
- Comments closed30 Sept 2025Usual deadline. Late comments may still count.
- Target decision (next)9 Nov 20252-month target for local developments.
- DecisionNot yet
The record
- Reference
- FIF/25/02549/SCR
- Address
- Lochty Meadows Site To The East Of Blackwood Road Glenrothes Fife
- Status
- Registered
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Fife Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







