Planning application · FIF/25/03297/EIA
Underground power cables proposed from Westfield to Kinghorn.
HVDC Link From Westfield Substation To South Of A921 Kinghorn Fife
Free with a City Scope account. One email, when the council decides.
Also email me new applications in this council · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Telecommunications
- Large 7/10
- Associated Infrastructure
- Cable Route Access
- Cable Routing
- Drainage Wastewater Infrastructure
- Electrical Infrastructure
Overview
Why it’s worth watching
A major energy transmission project crossing Fife with associated compounds and access works has substantial public and infrastructure significance.
- Today
- The cable routes are largely on agricultural land and settlement margins.
- Proposed
- Underground direct and alternating current cables, with associated infrastructure and temporary works.
- Size
- 266.90 ha site area
- Stage
- Past its target date of 19 Jun 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks full planning permission for underground high-voltage direct and alternating current cables as part of the Eastern Green Link 4 connection between Fife and Norfolk. The route would run from a proposed converter station east of Westfield Substation to a landfall north of Kinghorn, with associated infrastructure including temporary compounds, drainage and accesses. The application also describes temporary works such as access bellmouths, which are widened entrances from roads. It refers to earlier pre-application discussions under references 24/03149/SCO, 23/01019/PREAPP and 24/00157/PREAPP.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.
Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application FIF/25/03297/EIA?
Follow it on City Scope. This page is checked against the Fife Council planning register and shows the latest status, decision and documents for FIF/25/03297/EIA. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Fife Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The cables would be buried underground.
- 02
Temporary compounds and accesses are proposed for the works.
- 03
New or altered vehicle access to a public road is proposed.
- 04
Drainage is included in the associated infrastructure.
Questions
What is the Eastern Green Link 4 connection?
The application describes it as a transmission connection between Westfield in Fife and Norfolk, England.
What earlier applications are linked to this proposal?
The form refers to pre-application discussions under references 24/03149/SCO, 23/01019/PREAPP and 24/00157/PREAPP.
Has a decision been made?
No decision is recorded; the application is awaiting decision.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Cable Route Access
- Cable Routing
- Drainage Wastewater Infrastructure
- Electrical Infrastructure
What each tag is based on
- Associated Infrastructure
- “associated infrastructure including drainage, compounds and accesses”
- Cable Route Access
- “new accesses”
- Cable Routing
- “installation of high voltage direct and alternating current underground cables”
- Drainage Wastewater Infrastructure
- “drainage”
- Electrical Infrastructure
- “installation of high voltage direct and alternating current underground cables”
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received3 Dec 2025
- Validated19 Feb 2026The council has everything it needs.
- Comments closed12 Mar 2026Usual deadline. Late comments may still count.
- Target decision (next)19 Jun 20264-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- FIF/25/03297/EIA
- Address
- HVDC Link From Westfield Substation To South Of A921 Kinghorn Fife
- Status
- Awaiting decision
- Category
- Telecommunications
- Impact scale
- 7/10
- Authority
- Fife Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.