Planning application · FIF/26/02419/EIA
Drainage ponds, drilling platforms and cable works at Westfield Substation.
Westfield Substation Fife
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Small 4/10
- Drainage Wastewater Infrastructure
- Kilovolt Voltage Category 33kv Overhead Line
- Substation Connection Works
- Temporary Access Road
- Temporary Working Areas
Overview
- Proposed
- Temporary drainage ponds and drilling platforms, two 10 m high H-pole supports and a 33kV underground cable.
- Size
- 33 kV underground cable
- Stage
- Comments closed. Decision due by 25 Nov 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes temporary drainage ponds and drilling platforms, two 10 m high H-pole supports and a 33kV underground cable. The works are connected to application 25/03454/EIA for a substation.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.
Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application FIF/26/02419/EIA?
Follow it on City Scope. This page is checked against the Fife Council planning register and shows the latest status, decision and documents for FIF/26/02419/EIA. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Fife Council planning portal.
On the street
What neighbours would notice.
- 01
Temporary drainage ponds would be formed.
- 02
Drilling platforms would be formed.
- 03
Two 10 m high H-pole supports would be installed.
- 04
A 33kV underground cable would be installed.
Questions
Which other application is this connected to?
Application 25/03454/EIA is for the erection of a substation.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Drainage Wastewater Infrastructure
- Kilovolt Voltage Category 33kv Overhead Line
- Substation Connection Works
- Temporary Access Road
- Temporary Working Areas
- Underground Electrical Cabling
What each tag is based on
- Drainage Wastewater Infrastructure
- “Formation of temporary drainage ponds”
- Kilovolt Voltage Category 33kv Overhead Line
- “33kV underground cable”
- Substation Connection Works
- “in connection with application reference 25/03454/EIA for erection of substation”
- Temporary Access Road
- “drilling platforms”
- Temporary Working Areas
- “Formation of temporary drainage ponds and drilling platforms”
- Underground Electrical Cabling
- “33kV underground cable”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 25 November.
- Received1 Sept 2026
- Validated25 Sept 2026The council has everything it needs.
- Comments closed16 Oct 2026Usual deadline. Late comments may still count.
- Target decision (next)25 Nov 20262-month target for local developments.
- DecisionNot yet
The record
- Reference
- FIF/26/02419/EIA
- Address
- Westfield Substation Fife
- Status
- Registered
- Category
- New-Build & Major Development
- Impact scale
- 4/10
- Authority
- Fife Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.