Planning application · FIF/26/02598/FULL
Electricity substation proposed north of Pitkevy Farm.
Proposed Substation North Of Pitkevy Farm Leslie Fife
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Large 7/10
- Hardstanding
- Access Changes
- Access Roads
- Boundary Treatment
- Drainage Wastewater Infrastructure
Overview
Why it’s worth watching
This is a major new-build electricity substation proposal with substantial associated infrastructure and public road works in rural Fife.
- Today
- Agricultural land
- Proposed
- Electricity substation with access roads, drainage, SUDS ponds, hardstanding, fencing, retaining walls, landscaping and road works
- Size
- 34 ha site area · 335 m² control building floorspace · 7 parking spaces proposed
- Stage
- Comments closed. Decision due by 22 Jan 2027.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes an electricity substation and supporting infrastructure on agricultural land north of Pitkevy Farm, Leslie. It includes a modular control building and works to the public road to form passing places. The applicant also refers to pre-application discussions and an earlier pre-application submission, reference 24/02597/PREAPP.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,968 of 3,141 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 173 records from that period are still being added or checked.
Proposals and decisions come from Fife Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application FIF/26/02598/FULL?
Follow it on City Scope. This page is checked against the Fife Council planning register and shows the latest status, decision and documents for FIF/26/02598/FULL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Fife Council planning portal.
On the street
What neighbours would notice.
- 01
A new electricity substation and modular control building are proposed.
- 02
Access roads and hardstanding would be built, and fencing and retaining walls installed.
- 03
The plans include drainage, SUDS ponds and landscaping. SUDS means sustainable drainage systems.
- 04
Works to the public road would form passing places.
Questions
What drainage is proposed?
The form says the site would use private drainage, including a packaged sewage treatment plant. Rainwater harvesting is proposed to provide potable water.
Has the work started?
No. The form says the work has not started or been completed.
What is the current application status?
The application is registered. No decision is given in the record.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Hardstanding
- Boundary Treatment
- Landscaping
- Access Changes
- Access Roads
- Drainage Wastewater Infrastructure
- Substation
- Suds Pond
What each tag is based on
- Hardstanding
- “hardstanding”
- Access Changes
- “works to the public road to form passing places”
- Access Roads
- “including access roads”
- Boundary Treatment
- “fencing, retaining walls”
- Drainage Wastewater Infrastructure
- “drainage, SUDS ponds”
- Landscaping
- “landscaping”
- Substation
- “Erection of an electricity substation”
- Suds Pond
- “SUDS ponds”
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 22 January.
- Received22 Sept 2026
- Validated22 Sept 2026The council has everything it needs.
- Comments closed13 Oct 2026Usual deadline. Late comments may still count.
- Target decision (next)22 Jan 20274-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- FIF/26/02598/FULL
- Address
- Proposed Substation North Of Pitkevy Farm Leslie Fife
- Status
- Registered
- Category
- New-Build & Major Development
- Impact scale
- 7/10
- Authority
- Fife Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.






