Planning applicationGLA/25/02093/FUL

42 Bain Street Glasgow G40 2LA

Withdrawn (VW)Renewable Energy & Sustainability
Official records · coverage in progress

2,075 of 2,194 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 119 records from that period are still being added or checked.

Proposals and decisions come from Glasgow City Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

10 September 2025

Validated

10 October 2025

Planning Signals

1 detected trait

Specific
Roof Level Solar Panels
AI summary

Plans show solar PV panels added to the roof of The Pipe Factory, with equipment set back to limit visual impact.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application GLA/25/02093/FUL

42 Bain Street Glasgow G40 2LA

Withdrawn (VW)Renewable Energy, EV & Heat PumpsReceived Glasgow City Council

Plans show solar PV panels added to the roof of The Pipe Factory, with equipment set back to limit visual impact.

Reference
GLA/25/02093/FUL
Address
42 Bain Street Glasgow G40 2LA
Status
Withdrawn (VW)
Category
Renewable Energy, EV & Heat Pumps
Impact scale
3/10
Authority
Glasgow City Council
Received
Validated
Last scraped
Record created
Latitude
55.8547
Longitude
-4.2358

Plain-language summary

Plans show solar PV panels added to the roof of The Pipe Factory, with equipment set back to limit visual impact.

As filed with the council

Installation of solar panels on roof.