Planning application · GREENWICH/25/3952/NM
Section 96a non-material amendment to a student accommodation consent, covering core redesign, unit mix, louvres, generator relocation, fenestration and roof planting.
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
- Legal / Administrative
- Medium 6/10
Overview
- Stage
- Decided on 9 Jan 2026: Approved.
As lodged with the council
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow:Design alterations to the central circulation core to comply with fire regulations;Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios.Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms.Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O.Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade.Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing.Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15.Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.
The headline is a plain-English summary written with AI from the council record.
Keep reading
Track this application
How do I track planning application GREENWICH/25/3952/NM?
Follow it on City Scope. This page is checked against the Greenwich planning register and shows the latest status, decision and documents for GREENWICH/25/3952/NM. To comment on the application, use the Greenwich planning portal.
The impact
What the application says.
The application form
Every answer the applicant gave on the council’s form, searchable.
As lodged
The drawings.
Where it’s at
The council has decided on 9 January 2026.
- Received24 Nov 2025
- Validated25 Nov 2025The council has everything it needs.
- Comments closed16 Dec 2025Usual deadline. Late comments may still count.
- Target decision20 Jan 20268-week target for minor and other applications.
- Decision9 Jan 2026Approved.
The record
- Reference
- GREENWICH/25/3952/NM
- Address
- Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
- Status
- Decided
- Council decision
- Approved
- Decision issued
- Category
- Legal / Administrative
- Impact scale
- 6/10
- Authority
- Greenwich
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Greenwich Peninsula