Planning application · HACKNEY/2025/2381
Replacement of timber cladding, carrier system, insulation and cavity barriers on external timber projections with non-combustible materials.
2, Phipp Street, London, EC2A 4BP
- Extensions & Enlargements
- Medium 5/10
- Facade / Exterior
- Cladding Alterations
- External Alterations
- Fire Safety Improvements
- Timber Cladding
Overview
- Stage
- Decided on 14 Jan 2026: Approved.
As lodged with the council
The proposed works involve the removal and replacement of existing timber cladding and associated components on the building’s external timber projections. This intervention is driven by the need to enhance fire safety performance while preserving the architectural character and visual integrity of the façade. Cladding Replacement • The existing timber cladding will be carefully removed and replaced with Rockpanel Woods (Ebony), a non-combustible material selected for its close resemblance to the weathered timber currently in place. • The new cladding system will achieve a minimum fire classification of A2-s1, d0, in accordance with BS EN 13501-1, ensuring compliance with modern fire safety standards without compromising the building’s aesthetic. Carrier System and Insulation Replacement • The underlying timber carrier framework and insulation—both of which are combustible—will be fully removed. • These will be replaced with a non-combustible support system and insulation materials that also meet or exceed Class A2-s1, d0 fire performance, contributing to a safer and more resilient building envelope. Cavity Barriers • Cavity barriers will be installed within the rainscreen system in accordance with Approved Document B of the Building Regulations and the recommendations of the appointed Fire Engineer.
The headline is a plain-English summary written with AI from the council record.
Keep reading
Track this application
How do I track planning application HACKNEY/2025/2381?
Follow it on City Scope. This page is checked against the Hackney planning register and shows the latest status, decision and documents for HACKNEY/2025/2381. To comment on the application, use the Hackney planning portal.
The impact
What it involves.
Tags
- Facade / Exterior
- Cladding Alterations
- External Alterations
- Fire Safety Improvements
- Timber Cladding
What each tag is based on
- Facade / Exterior
- “replaced with Rockpanel Woods (Ebony), a non-combustible material”, “The proposed works involve the removal and replacement of existing timber cladding and associated components on the building’s external timber projections. This intervention is driven by the need to enhance fire safet...”
- Cladding Alterations
- “removal and replacement of existing timber cladding”
- External Alterations
- “replacement of existing timber cladding and associated components on the building’s external timber projections”
- Fire Safety Improvements
- “driven by the need to enhance fire safety performance”
- Timber Cladding
- “removal and replacement of existing timber cladding”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
The council has decided on 14 January 2026.
- Validated29 Oct 2025The council has everything it needs.
- Comments closed19 Nov 2025Usual deadline. Late comments may still count.
- Target decision24 Dec 20258-week target for minor and other applications.
- Decision14 Jan 2026Approved.
The record
- Reference
- HACKNEY/2025/2381
- Address
- 2, Phipp Street, London, EC2A 4BP
- Status
- Approved
- Council decision
- Approved
- Decision issued
- Category
- Extensions & Enlargements
- Impact scale
- 5/10
- Authority
- Hackney
- Validated
- Last checked
- Added to City Scope
- Ward
- Hoxton East & Shoreditch
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.
