Skip to content

Planning application · HAMMERSMITH-FULHAM/2025/03262/FUL

HAMMERSMITH-FULHAM/2025/03262/FULApprovedWorth watching

Replace the EPS render system with non-combustible mineral wool render, plus like-for-like GRP ventilation cowls and aluminium window trims, across all elevations.

The Piper Building, Peterborough Road, SW6 3EF

Palace & Hurlingham ward · Hammersmith & Fulham

Category
Windows, Doors & Glazing
Scale
Small 4/10
Tags
  • Facade / Exterior
  • Cladding Alterations
  • Flues & Ventilation
  • Render Application

Overview

Why it’s worth watching

Replacement of combustible EPS cladding with non-combustible mineral wool render across a large building is a material fire-safety change.

Type
Full planning permission
Stage
Decided on 11 Feb 2026: Approved.

As lodged with the council

Replacement of the existing insulated Expanded Polystyrene (EPS) render system with a new non-combustible insulated mineral wool render system in matching colour and texture, and replacement of the existing GRP ventilation cowls and aluminium window trim profiles like for like, to the front, rear and both side elevations of the building.

The headline is a plain-English summary written with AI from the council record.

Keep reading

Track this application

How do I track planning application HAMMERSMITH-FULHAM/2025/03262/FUL?

Follow it on City Scope. This page is checked against the Hammersmith & Fulham planning register and shows the latest status, decision and documents for HAMMERSMITH-FULHAM/2025/03262/FUL. To comment on the application, use the Hammersmith & Fulham planning portal.