Planning application · HARINGEY/HGY/2026/1857
Section 73 variation for amended detailed element: extra height, massing and footprint changes, Block N4D replaced by pavilion, revised floorspace and public realm.
The O2 Centre 255 Finchley Road,, London,, NW3 6LU
- New-Build & Major Development
- Major 9/10
- Commercial Use
- Community Use
- Demolition
- Landscaping
- Leisure Culture
Overview
Why it’s worth watching
Section 73 variation seeks amendments to the detailed element of the O2 Centre redevelopment including additional height, a pavilion replacing Block N4D, revised floorspace, affordable housing and public realm.
- Stage
- Council responded: No Objection.
As lodged with the council
RE-CONSULTATION FOR ENVIRONMENTAL STATEMENT. Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary Conditions I4 (Severability Condition), AD1 (Approved Drawings - Masterplan), AD2 (Approved Drawings - Reserved Matters), AD3 (Approved Drawings - Phase 1), RM1 (Parameter Plans and Development Specification), RM6 (Phasing Plan), RM11 (Reserved Matters - Access Statement), RM21 (Reserved Matters - Total floorspace), D20 (Photo-voltaic Cells), D21 (Phase 1 Long Stay Cycle Parking), D22 (Phase 2 Short Stay Cycle Parking), D24 (Phase 1 Disabled Car Parking), D26 (Phase 1 Fire Safety Implementation of Approved Measures), and M28 (Phase-Wide Lighting Strategy) and the removal of Conditions M6 (Enabling Works) and M7 (Major Utilities Infrastructure) of planning permission ref. 2022/0528/P dated 20 December 2023 for 'Detailed planning permission for Development Plots N3-E, N4, and N5 and Outline planning permission for Development Plots N1, N2, N3, N6, N7, S1 and S8, including demolition of all existing structures and associated works, and redevelopment to include residential development (Class C3), commercial, business and service uses (Class E), local community uses (Class F2), and Sui Generis leisure uses (including cinema and drinking establishments) together with all landscaping, public realm, cycle parking and disabled car parking, highway works and infrastructure within and associated with those Development Plots, in accordance with the Development Specification.?For the avoidance of doubt, the Detailed and Outline planning permission are separate and severable for each of the Plots shown on plan P011 and the description of development on any decision notice issued pursuant to the application would reflect that', to allow for amendments to the Detailed Element (Plots N3-E, N4 and N5) including additional height, alterations to the design, massing and footprint of the buildings; the replacement of Block N4D with a pavilion building; additional residential floorspace (and corresponding reduction in floorspace within Outline Elements); revisions to affordable housing and unit mix and internal layouts; relocation and reduction in community (Class F2) floorspace, additional commercial (Class E(a)) floorspace, reduction in professional services (Class E(c)) floorspace, additional blue badge parking and cycle parking; revised landscaping and additional public realm; and associated works. (Observations to L.B. Camden - their planning reference 2025/0484/P)
The headline is a plain-English summary written with AI from the council record.
Keep reading
Track this application
How do I track planning application HARINGEY/HGY/2026/1857?
Follow it on City Scope. This page is checked against the Haringey planning register and shows the latest status, decision and documents for HARINGEY/HGY/2026/1857. To comment on the application, use the Haringey planning portal.
The impact
What it involves.
Tags
- Demolition
- Landscaping
- Commercial Use
- Community Use
- Leisure Culture
- Mixed Use
- Public Realm
- Residential Development
What each tag is based on
- Commercial Use
- “commercial, business and service uses (Class E)”
- Community Use
- “local community uses (Class F2)”
- Demolition
- “demolition”
- Landscaping
- “revised landscaping”
- Leisure Culture
- “Sui Generis leisure uses (including cinema and drinking establishments)”
- Mixed Use
- “redevelopment to include residential development (Class C3), commercial, business and service uses (Class E), local community uses (Class F2), and Sui Generis leisure uses”
- Public Realm
- “revised landscaping and additional public realm”
- Residential Development
- “redevelopment to include residential development (Class C3)”
Where it’s at
The council has responded.
- Validated30 Jun 2026The council has everything it needs.
- Comments closed21 Jul 2026Usual deadline. Late comments may still count.
- Target decision29 Sept 202613-week target for major applications.
- DecisionNo Objection
Planning terms
- Major development
- In England, 10 or more homes, 1,000 m² or more of new floor space, or a site of 1 hectare or more. These have a 13-week target.
- Use class C3
- Dwellinghouses: homes lived in by one household or a small group.
- Use class E
- Commercial, business and service uses, such as shops, cafés, offices, gyms and clinics. A building can switch between them without planning permission.
- Sui generis
- A use in a class of its own, such as a pub, a hot food takeaway or a large shared house. Any change needs planning permission.
- Public realm
- Streets, squares and paths open to everyone.
The record
- Reference
- HARINGEY/HGY/2026/1857
- Address
- The O2 Centre 255 Finchley Road,, London,, NW3 6LU
- Status
- Decision Made
- Council decision
- No Objection
- Category
- New-Build & Major Development
- Impact scale
- 9/10
- Authority
- Haringey
- Validated
- Last checked
- Added to City Scope
- Ward
- West Hampstead
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.
