Skip to content

Planning application · HARINGEY/HGY/2026/2571

HARINGEY/HGY/2026/2571Decision made

Berol Quarter, 25 Ashley Road, Tottenham, London, N17 9LJ

Tottenham Hale ward · Haringey

Overview

GLA last reported: Approve (8 October 2026). The council's current status takes precedence; its result list has not verified these decision details. Source report captured .

As lodged with the council

Non-Material Amendment to Conditions 8 (BREEAM Certificates (PRE-COMMENCEMENT)), 14 (Surface Water Drainage (Pre-occupation)), 15 (Surface water network (Thames Water) (Pre-occupation)), 16 (Water network capacity (Thames Water) (Pre-occupation)), 17 (Flood Warning and Evacuation Plan (FWEP) (Pre-occupation)), 19 (Biodiversity (Pre-occupation)), 22 (Living roofs (Pre-superstructure)), 23 (Landscape and ecological management plan (LEMP) (Pre-occupation)), 24 (Energy Strategy (Pre-superstructure)), 25 (DEN Connection (Pre-superstructure)), 28 (Circular Economy (Pre-occupation)), 30 (Secured by Design (Pre-occupation)), 37 (Site Waste Management Plan (PRE-COMMENCEMENT)), 40 (London Underground Asset Protection (PRE-COMMENCEMENT)), 42 (Demolition/Construction Environmental Management Plans (PRECOMMENCEMENT)) and 44 (Management and Control of Dust (PRE-COMMENCEMENT)) of the Berol Quarter Planning Permission (ref: HGY/2025/0930) dated 30 June 2026 - to enable details to be approved under these conditions on a phase-by-phase basis.

Keep reading

Track this application

How do I track planning application HARINGEY/HGY/2026/2571?

Follow it on City Scope. This page is checked against the Haringey planning register and shows the latest status, decision and documents for HARINGEY/HGY/2026/2571. To comment on the application, use the Haringey planning portal.