Planning application · HLD/25/02050/SCOP
Proposed wind farm extension redesign with up to 15 turbines, maximum blade tip height of 230m, access tracks, substation and control building.
Glenmoriston Estate North Of Levishie Invermoriston
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Substation
Overview
- Stage
- Council responded on 2 Jul 2025: Scoping Application Decision Issued.
The council writes only to properties within 20 metres of an application site. Who is told
As lodged with the council
Bhlaraidh Wind Farm Extension Redesign - Erection and operation of a wind farm, comprising of up to 15 wind turbines with a maximum blade tip height of 230m, access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00006176
The headline is a plain-English summary written with AI from the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/02050/SCOP?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02050/SCOP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertThe impact
What it involves.
Tags
- Associated Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Substation
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “access tracks, borrow pits”
- Rail Infrastructure
- “Glenmoriston Estate North Of Levishie Invermoriston”
- Railway Infrastructure
- “Glenmoriston Estate North Of Levishie Invermoriston”
- Railway Station
- “Glenmoriston Estate North Of Levishie Invermoriston”
- Substation
- “substation, control building”
- Wind Turbine
- “up to 15 wind turbines”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 2 July 2025.
- Received29 May 2025
- Validated29 May 2025The council has everything it needs.
- Comments closed19 Jun 2025Usual deadline. Late comments may still count.
- Target decision29 Jul 20252-month target for local developments.
- Decision2 Jul 2025Scoping Application Decision Issued.
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- HLD/25/02050/SCOP
- Address
- Glenmoriston Estate North Of Levishie Invermoriston
- Status
- Decided
- Council decision
- Scoping Application Decision Issued
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.