Planning application · HLD/25/02215/S37
9 poles and an overhead power line proposed near Rossal.
Land 120M South Of Straked House Rossal Rogart
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Medium 5/10
- Overhead Utility Lines
- Section 37 Consent
- Substation
- Underground Electrical Cabling
Overview
- Today
- An existing 11kv overhead line and low-voltage network.
- Proposed
- A 9-span overhead spur, 9 single poles, 6 stay wires, a transformer and underground cable.
- Size
- 9 single poles · 9 spans in the spur · 6 stay wires
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes a 9-span branch from the existing 11kv overhead line as part of network reinforcement works. It includes 9 single poles, stay wires and a transformer, with cable connections to the existing low-voltage network.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/02215/S37?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02215/S37. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A 9-span overhead power line and 9 single poles are proposed.
- 02
6 stay wires and a transformer on P9 are proposed.
- 03
Underground cable would be laid down the pole to connect to the existing low-voltage network. High-voltage and low-voltage earth wire would also be laid.
Tags
- Overhead Utility Lines
- Section 37 Consent
- Substation
- Underground Electrical Cabling
What each tag is based on
- Overhead Utility Lines
- “11kv Overhead Line”, “11kv spur”
- Section 37 Consent
- “25/02215/S37”
- Substation
- “installing a transformer”
- Underground Electrical Cabling
- “underground cable”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received9 Jun 2025
- Validated9 Jun 2025The council has everything it needs.
- Comments closed30 Jun 2025Usual deadline. Late comments may still count.
- Target decision9 Aug 20252-month target for local developments.
- DecisionDecided
The record
- Reference
- HLD/25/02215/S37
- Address
- Land 120M South Of Straked House Rossal Rogart
- Status
- Decided
- Category
- New-Build & Major Development
- Impact scale
- 5/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.