Planning application · HLD/25/02247/SCOP
Scoping opinion sought for 18-turbine Achany Wind Farm Extension.
Land 2km NE Of Glencassley Castle Rosehall
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Associated Infrastructure
- Eia Scoping
- House Extension
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
Overview
Why it’s worth watching
A scoping opinion is recorded for the Achany Wind Farm Extension comprising 18 turbines up to 200m tip height, a substantial energy infrastructure proposal.
- Proposed
- A wind farm extension with 18 turbines and ancillary infrastructure
- Size
- 18 wind turbines · 200 m maximum blade tip height
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks The Highland Council’s scoping opinion for a wind farm extension. A scoping opinion sets out what environmental information should be covered; it is not planning permission. The description includes 18 wind turbines and ancillary infrastructure.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/02247/SCOP?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02247/SCOP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The proposal includes 18 wind turbines, with a maximum blade tip height of 200m.
- 02
Ancillary infrastructure is also proposed; the description does not specify what it includes.
Tags
- House Extension
- Associated Infrastructure
- Eia Scoping
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
What each tag is based on
- Associated Infrastructure
- “and ancillary infrastructure”
- Eia Scoping
- “Scoping Opinion for erection and operation of a wind farm”
- House Extension
- “extension”
- Wind Turbine
- “wind farm comprising 18 wind turbines”
- Wind Turbine Count 13 Or Up To 13
- “18 wind turbines”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received13 Jun 2025
- Validated13 Jun 2025The council has everything it needs.
- Comments closed4 Jul 2025Usual deadline. Late comments may still count.
- Target decision13 Aug 20252-month target for local developments.
- DecisionDecided
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- HLD/25/02247/SCOP
- Address
- Land 2km NE Of Glencassley Castle Rosehall
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.