Planning applicationHLD/25/02342/FUL

Greenfield Duror Appin PA38 4DA

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

23 June 2025

Validated

24 June 2025

Planning Signals

1 detected trait

Specific
Underground Electrical Cabling
AI summary

Solar photovoltaic panels and associated underground cabling are proposed, providing on-site renewable energy with moderate physical change.

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/02342/FUL

Greenfield Duror Appin PA38 4DA

DecidedRenewable Energy, EV & Heat PumpsReceived The Highland Council

Solar photovoltaic panels and associated underground cabling are proposed, providing on-site renewable energy with moderate physical change.

Reference
HLD/25/02342/FUL
Address
Greenfield Duror Appin PA38 4DA
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
4/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
56.6488
Longitude
-5.2974

Plain-language summary

Solar photovoltaic panels and associated underground cabling are proposed, providing on-site renewable energy with moderate physical change.

As filed with the council

Installation of Solar photovoltaic panel array and associated underground cables