Planning application · HLD/25/02372/SCOP
4.8 km overhead line and about 1 km of cable proposed.
Land 140M NW Of 2 Clashnabuiac Alness
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Eia Scoping
- Overhead Utility Lines
- Substation Connection Works
- Underground Electrical Cabling
- Wind Turbine
Overview
Why it’s worth watching
This is a material grid connection proposal for a wind farm, involving roughly 4.8 km of new overhead line and 1 km of underground cable to Fyrish Substation.
- Proposed
- A 132 kV overhead line and underground cable connecting the proposed wind farm to Fyrish Substation.
- Size
- 132 kiloVolt (kV) voltage
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application describes a connection from the proposed Abhainn Dubh Wind Farm to the existing Fyrish Substation. It would involve constructing and operating a 132 kiloVolt (kV) single-circuit overhead line, approximately 4.8 km long, and approximately 1 km of underground cable.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/02372/SCOP?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02372/SCOP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
An overhead electricity line is proposed.
- 02
Underground cable is proposed.
- 03
Construction work is proposed.
Tags
- Eia Scoping
- Overhead Utility Lines
- Substation Connection Works
- Underground Electrical Cabling
- Wind Turbine
What each tag is based on
- Eia Scoping
- “SCOP”
- Overhead Utility Lines
- “overhead line (OHL)”
- Substation Connection Works
- “connect ... to the existing Fyrish Substation”
- Underground Electrical Cabling
- “1 km of underground cable”
- Wind Turbine
- “Abhainn Dubh Wind Farm”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received23 Jun 2025
- Validated23 Jun 2025The council has everything it needs.
- Comments closed14 Jul 2025Usual deadline. Late comments may still count.
- Target decision23 Aug 20252-month target for local developments.
- DecisionDecided
The record
- Reference
- HLD/25/02372/SCOP
- Address
- Land 140M NW Of 2 Clashnabuiac Alness
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.