Skip to content

Planning application · HLD/25/02418/S36

HLD/25/02418/S36Awaiting decisionWorth watching

Wind farm with up to 15 turbines proposed near Lairg.

Land 3.4KM NE Of Taigh Na Dreoilín Lairg

The Highland Council

Free with a City Scope account. One email, when the council decides.

Also email me new applications nearby · £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Large 8/10
Tags
  • Section 36 Consent
  • Wind Turbine

Overview

Why it’s worth watching

Large-scale renewable energy development with significant infrastructure and landscape implications for the Lairg area.

Proposed
A wind farm with up to 15 turbines, battery energy storage and associated infrastructure
Size
250 m maximum blade tip height · 35 years operating period
Stage
Past its target date of 27 Aug 2025.

The council writes only to properties within 20 metres of an application site. Who is told

Technical appendix 6.2 - eia - vol 4 - ztv and visualisation information

In plain English

The application proposes Coille Linne Wind Farm, with up to 15 turbines, a battery energy storage system and associated infrastructure. The turbines would have a maximum blade tip height of 250m, and the wind farm would operate for 35 years. The Energy Consents Unit will determine the application; its reference is ECU00005163.

Written with AI from the application form and the council record.

Keep reading

Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

Track this application

How do I track planning application HLD/25/02418/S36?

Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02418/S36. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.