Planning application · HLD/25/02743/SCOP
Up to four wind turbines and battery storage near Castletown.
Land 695M SW Of Kirkfield Cottage Castletown
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Eia Scoping
- Wind Turbine
Overview
Why it’s worth watching
Four turbines up to 200m with battery storage is a major energy infrastructure proposal with clear landscape and local consequence.
- Proposed
- A wind farm with up to four turbines, battery storage and associated infrastructure
- Size
- 200 m maximum blade tip height
- Stage
- Decided on 6 Oct 2025: Case CLOSED.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application describes a wind farm with up to four turbines, a battery energy storage system and associated infrastructure. It is for the erection and operation of the wind farm.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/02743/SCOP?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02743/SCOP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Up to four wind turbines are proposed, with a maximum blade tip height of 200m.
- 02
A battery energy storage system and associated infrastructure are also proposed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Eia Scoping
- Wind Turbine
What each tag is based on
- Eia Scoping
- “SCOP”
- Wind Turbine
- “wind farm comprising of up to 4 wind turbines”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 6 October 2025.
- Received21 Jul 2025
- Validated21 Jul 2025The council has everything it needs.
- Comments closed11 Aug 2025Usual deadline. Late comments may still count.
- Target decision21 Sept 20252-month target for local developments.
- Decision6 Oct 2025Case CLOSED.
The record
- Reference
- HLD/25/02743/SCOP
- Address
- Land 695M SW Of Kirkfield Cottage Castletown
- Status
- Unknown
- Council decision
- Case CLOSED
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.





