Plans for a BESS (50MW+) at Limekiln Wind Farm, adding substation extensions, access and ancillary infrastructure for grid storage.
The record
- Reference
- HLD/25/02861/S36
- Address
- Land 1500M SE Of Borlum House Reay
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 58.5469
- Longitude
- -3.7534
What is proposed
Plain-language summary
Plans for a BESS (50MW+) at Limekiln Wind Farm, adding substation extensions, access and ancillary infrastructure for grid storage.
As filed with the council
Limekiln Battery Energy Storage System (BESS) - Construction and operation of a proposed Battery Energy Storage System (BESS) (over 50 MW) and an extension to the existing Limekiln Wind Farm Substation, associated infrastructure, access and ancillary works. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00006154