Planning application · HLD/25/02964/PIP
Ayre offshore wind farm onshore infrastructure proposed near Bower.
Land 1500M East Of Old Free Church Manse Bower
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Drainage Wastewater Infrastructure
- Landscaping
- Offshore Wind Farm
- Parking Access
Overview
Why it’s worth watching
This is a major offshore wind farm's onshore grid connection, a proposal with clear public consequence and substantial infrastructure, though the record evidence is limited.
- Today
- Mainly agricultural land, with some forestry and existing roads and tracks.
- Proposed
- Onshore wind farm transmission infrastructure, including a landfall, substation, cables, temporary construction areas, access, drainage and landscaping.
- Size
- 1,205.50 ha site area
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This application seeks planning permission in principle, which establishes whether development may proceed before detailed plans are considered. It covers onshore transmission infrastructure for the proposed Ayre Offshore Wind Farm, including a cable landfall, cable circuits, a gas-insulated substation, temporary construction areas, access, drainage and landscaping. The form says the site is mainly agricultural land, with some forestry and existing roads and tracks.
Written with AI from the application form and the council record.
Read our story
Ayre transmission works at Bower get permission in principle
Highland Council granted permission in principle in March for Ayre’s onshore cable and substation works at Bower; specified details still need approval before each stage.
City Scope Journal →Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/02964/PIP?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02964/PIP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A new or altered vehicle access to a public road is proposed; the form does not give its location.
- 02
Temporary construction areas and access are included in the proposal.
- 03
Drainage and landscaping are proposed.
Questions
What does planning permission in principle mean?
It asks whether development may proceed in principle, with detailed plans considered later.
What earlier advice or applications are mentioned?
The form refers to pre-application advice under reference 23/03886/PREMAJ and a scoping opinion under reference 24/00243/SCOP.
What drainage is proposed?
The form describes sustainable drainage for the substation and private drainage arrangements.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Landscaping
- Associated Infrastructure
- Drainage Wastewater Infrastructure
- Offshore Wind Farm
- Parking Access
- Temporary Working Areas
- Transmission Substation Buildings
What each tag is based on
- Associated Infrastructure
- “temporary construction areas, access, drainage, landscaping and associated infrastructure”
- Drainage Wastewater Infrastructure
- “drainage”
- Landscaping
- “landscaping and associated infrastructure”
- Offshore Wind Farm
- “Ayre Offshore Wind Farm onshore works”
- Parking Access
- “access”
- Temporary Working Areas
- “temporary construction areas”
- Transmission Substation Buildings
- “construction of onshore transmission infrastructure comprising cable landfall, substation”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received7 Aug 2025
- Validated20 Aug 2025The council has everything it needs.
- Comments closed10 Sept 2025Usual deadline. Late comments may still count.
- Target decision20 Dec 20254-month target for major developments.
- DecisionDecided
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- HLD/25/02964/PIP
- Address
- Land 1500M East Of Old Free Church Manse Bower
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.