Planning application · HLD/25/02964/PIP

HLD/25/02964/PIPDecidedWorth watching

Ayre offshore wind farm onshore infrastructure proposed near Bower.

Land 1500M East Of Old Free Church Manse Bower

The Highland Council

Preview alerts near this site

Free preview. £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Large 7/10
Tags
  • Associated Infrastructure
  • Drainage Wastewater Infrastructure
  • Landscaping
  • Offshore Wind Farm
  • Parking Access

Overview

Why it’s worth watching

This is a major offshore wind farm's onshore grid connection, a proposal with clear public consequence and substantial infrastructure, though the record evidence is limited.

Today
Mainly agricultural land, with some forestry and existing roads and tracks.
Proposed
Onshore wind farm transmission infrastructure, including a landfall, substation, cables, temporary construction areas, access, drainage and landscaping.
Size
1,205.50 ha site area
Stage
Decided: Decided.

The council writes only to properties within 20 metres of an application site. Who is told

Application form

In plain English

This application seeks planning permission in principle, which establishes whether development may proceed before detailed plans are considered. It covers onshore transmission infrastructure for the proposed Ayre Offshore Wind Farm, including a cable landfall, cable circuits, a gas-insulated substation, temporary construction areas, access, drainage and landscaping. The form says the site is mainly agricultural land, with some forestry and existing roads and tracks.

Written with AI from the application form and the council record.

Read our story

Ayre transmission works at Bower get permission in principle

Highland Council granted permission in principle in March for Ayre’s onshore cable and substation works at Bower; specified details still need approval before each stage.

City Scope Journal →

Keep reading

Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

Track this application

How do I track planning application HLD/25/02964/PIP?

Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02964/PIP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.

Set up a planning alert