Planning application · HLD/25/02996/S36
20 turbines proposed for Ballach Wind Farm.
Land 6260M NE Of Erchless Forest Cottage Struy Beauly
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
A 20-turbine wind farm with battery storage is a major infrastructure proposal with clear landscape, visual and community consequences in the Struy/Beauly area.
- Proposed
- A wind farm with 20 turbines, a battery energy storage system and supporting infrastructure
- Size
- 20 turbines · 35 years proposed operating period
- Stage
- Past its target date of 8 Oct 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for Ballach Wind Farm, with 20 turbines up to 230m to blade tip, a battery energy storage system and supporting infrastructure. The wind farm is proposed to operate for 35 years. The Energy Consents Unit will determine the application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/02996/S36?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/02996/S36. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
The proposal includes 20 wind turbines, with a maximum blade tip height of up to 230m.
- 02
A battery energy storage system would be installed; its size and location are not stated.
- 03
Ancillary infrastructure is proposed; the description does not give details.
Questions
Who will decide the application?
The Energy Consents Unit will determine it. The case gives reference ECU00005219 for the Unit's application search.
Tags
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “ancillary infrastructure”
- Section 36 Consent
- “25/02996/S36”, “This case will be determined by the Energy Consents Unit”
- Wind Turbine
- “Erection and Operation of a Wind Farm”, “20 turbines with a maximum blade tip height of up to 230m”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received8 Aug 2025
- Validated8 Aug 2025The council has everything it needs.
- Comments closed29 Aug 2025Usual deadline. Late comments may still count.
- Target decision (next)8 Oct 20252-month target for local developments.
- DecisionNot yet
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- HLD/25/02996/S36
- Address
- Land 6260M NE Of Erchless Forest Cottage Struy Beauly
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







