Planning application · HLD/25/03311/S37
173km overhead electricity line proposed from Spittal to Beauly.
Land 2430M SW Of Loch Buidhe Bonar Bridge
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Major 9/10
- Associated Infrastructure
- Overhead Utility Lines
- Section 37 Consent
- Steel Lattice Tower Replacement Removal
- Substation
Overview
Why it’s worth watching
This is a major 173km 400 kV overhead transmission line proposal with new substations and associated diversions across the Highlands, handled by the Energy Consents Unit under reference ECU00006008.
- Today
- The description identifies an existing substation at Loch Buidhe and existing 132 kV and 275 kV overhead lines.
- Proposed
- A 173km 400 kV overhead line, with steel lattice towers and proposed substations at Banniskirk, Carnaig and Fanellan.
- Size
- 173 km new overhead line · 400 kV line voltage · 18 km existing lines with permanent diversion works
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes a new 400 kV overhead electricity line, supported by steel lattice towers, between proposed substations at Banniskirk and Fanellan. It would connect via a proposed substation at Carnaig, near the existing Loch Buidhe substation, and include permanent diversion works to 18km of existing overhead lines, temporary diversion works and associated development. The Energy Consents Unit will determine the application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/03311/S37?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/03311/S37. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A new overhead electricity line supported by steel lattice towers is proposed.
- 02
New substations are proposed at Banniskirk, Carnaig and Fanellan.
- 03
Permanent diversion works to 18km of existing overhead lines are proposed, along with temporary diversion works.
Questions
Who will decide the application?
The Energy Consents Unit will determine it. The description gives reference ECU00006008 for its application search.
What are the proposed substations?
The description names proposed substations at Banniskirk, Carnaig and Fanellan. Carnaig is near the existing Loch Buidhe substation.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Overhead Utility Lines
- Section 37 Consent
- Steel Lattice Tower Replacement Removal
- Substation
What each tag is based on
- Associated Infrastructure
- “ancillary development and associated works”
- Overhead Utility Lines
- “173km of new 400 kV overhead electricity line”, “supported on steel lattice tower structures”
- Section 37 Consent
- “25/03311/S37”, “Energy Consents Unit”
- Steel Lattice Tower Replacement Removal
- “supported on steel lattice tower structures”, “diversion works to 18km of existing ... overhead electricity lines”
- Substation
- “proposed new substations at Banniskirk”, “proposed new substation at Carnaig”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received3 Sept 2025
- Validated3 Sept 2025The council has everything it needs.
- Comments closed24 Sept 2025Usual deadline. Late comments may still count.
- Target decision3 Jan 20264-month target for major developments.
- DecisionDecided
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- HLD/25/03311/S37
- Address
- Land 2430M SW Of Loch Buidhe Bonar Bridge
- Status
- Decided
- Category
- New-Build & Major Development
- Impact scale
- 9/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.