Planning applicationHLD/25/03578/FUL

Land 195M NW Of 3 Corriekinloch Corriekinloch Lairg

Under ConsiderationWorth watchingNew-Build & Major Development
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 2
Received

22 September 2025

Validated

25 September 2025

Planning Signals

8 detected traits

Works
DemolitionHouse ExtensionLandscaping
Specific
Associated InfrastructureDrainage Wastewater InfrastructureMechanical Plant
Application Insights

No form insights available yet.

AI summary

Proposed works at Cassley 132kV substation: demolition of part of the control building and platform, plus a new substation building with plant, drainage and landscaping.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/03578/FUL

Land 195M NW Of 3 Corriekinloch Corriekinloch Lairg

Under ConsiderationNew-Build & Major DevelopmentReceived The Highland Council

Proposed works at Cassley 132kV substation: demolition of part of the control building and platform, plus a new substation building with plant, drainage and landscaping.

Reference
HLD/25/03578/FUL
Address
Land 195M NW Of 3 Corriekinloch Corriekinloch Lairg
Status
Under Consideration
Category
New-Build & Major Development
Impact scale
6/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
58.1879
Longitude
-4.7291

Plain-language summary

Proposed works at Cassley 132kV substation: demolition of part of the control building and platform, plus a new substation building with plant, drainage and landscaping.

As filed with the council

Cassley 132kV Substation Extension - demolition of control building, platform extension, and erection and operation of substation building, plant equipment, drainage, temporary construction compound, laydown area(s), landscaping and ancillary infrastructure