Planning applicationHLD/25/03629/SCRE

Land 2430M SW Of Loch Buidhe Bonar Bridge

Awaiting decisionWorth watchingLegal / Administrative
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

23 September 2025

Validated

23 September 2025

Planning Signals

3 detected traits

Specific
Eia ScreeningOverhead Utility LinesSteel Lattice Tower Replacement Removal
AI summary

EIA screening for new 132kV overhead line link near Loch Buidhe, plus dismantling of existing ShinLoch Buidhe connection.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/03629/SCRE

Land 2430M SW Of Loch Buidhe Bonar Bridge

Awaiting decisionLegal / AdministrativeReceived The Highland Council

EIA screening for new 132kV overhead line link near Loch Buidhe, plus dismantling of existing ShinLoch Buidhe connection.

Reference
HLD/25/03629/SCRE
Address
Land 2430M SW Of Loch Buidhe Bonar Bridge
Status
Awaiting decision
Category
Legal / Administrative
Impact scale
6/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.9487
Longitude
-4.3475

Plain-language summary

EIA screening for new 132kV overhead line link near Loch Buidhe, plus dismantling of existing ShinLoch Buidhe connection.

As filed with the council

EIA Screening Opinion Request for the construction and operation of a new 132kV overhead line (OHL) connection between Shin Substation and a proposed cable sealing end (CSE) compound approximately 2 km west of Loch Buidhe Substation, and the dismantling of the existing 132kV OHL connection between Shin Substation and Loch Buidhe Substation