Planning applicationHLD/25/04104/S36

Land 2KM NE Of Gilles Fencing Ardochy Invergarry

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 2
Received

27 October 2025

Validated

27 October 2025

Planning Signals

10 detected traits

Specific
Access RoadsAssociated InfrastructureMet MastRail InfrastructureRailway InfrastructureRailway Station
Application Insights

No form insights available yet.

AI summary

Beinneun 2 wind farm proposal for up to 19 turbines (up to 200m blade tips), BESS and substation, with access tracks and met mast.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/04104/S36

Land 2KM NE Of Gilles Fencing Ardochy Invergarry

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived The Highland Council

Beinneun 2 wind farm proposal for up to 19 turbines (up to 200m blade tips), BESS and substation, with access tracks and met mast.

Reference
HLD/25/04104/S36
Address
Land 2KM NE Of Gilles Fencing Ardochy Invergarry
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.1089
Longitude
-4.8793

Plain-language summary

Beinneun 2 wind farm proposal for up to 19 turbines (up to 200m blade tips), BESS and substation, with access tracks and met mast.

As filed with the council

Beinneun 2 Wind Farm - Erection and operation of a wind farm for a period of 40 years, comprising of up to 19 wind turbines with a maximum blade tip height of 200m, battery energy storage system (BESS), met mast, access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00004972