CityScope · Planning Updates
Application HLD/25/04104/S36
Land 2KM NE Of Gilles Fencing Ardochy Invergarry
Beinneun 2 wind farm proposal for up to 19 turbines (up to 200m blade tips), BESS and substation, with access tracks and met mast.
The record
- Reference
- HLD/25/04104/S36
- Address
- Land 2KM NE Of Gilles Fencing Ardochy Invergarry
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.1089
- Longitude
- -4.8793
What is proposed
Plain-language summary
Beinneun 2 wind farm proposal for up to 19 turbines (up to 200m blade tips), BESS and substation, with access tracks and met mast.
As filed with the council
Beinneun 2 Wind Farm - Erection and operation of a wind farm for a period of 40 years, comprising of up to 19 wind turbines with a maximum blade tip height of 200m, battery energy storage system (BESS), met mast, access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00004972
