CityScope · Planning Updates
Application HLD/25/04141/S36
Millenium Windfarm Glenmoriston
Proposed Millennium East wind farm with up to 8 turbines (180200m tip height), access tracks, substation and control building for 35 years.
The record
- Reference
- HLD/25/04141/S36
- Address
- Millenium Windfarm Glenmoriston
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.1423
- Longitude
- -4.8159
What is proposed
Plain-language summary
Proposed Millennium East wind farm with up to 8 turbines (180200m tip height), access tracks, substation and control building for 35 years.
As filed with the council
Millennium East Wind Farm - Erection and operation of a wind farm for a period of 35 years, comprising a total of 8 wind turbines with Turbines T1, T2, T3, T7 and T8 having a maximum blade tip height of 180m, and Turbines T4, T5 and T6 having a maximum blade tip height of 200m, access tracks, borrow pit extension, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00005013