Planning application · HLD/25/04141/S36
8 turbines proposed for Millennium East Wind Farm.
Millenium Windfarm Glenmoriston
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- House Extension
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
Overview
Why it’s worth watching
An 8-turbine wind farm with turbines up to 200m tip height is a substantial renewable energy development sought for 35 years, with clear public infrastructure implications.
- Proposed
- A wind farm with 8 turbines and supporting infrastructure, operating for 35 years.
- Size
- 8 wind turbines · 180 m maximum blade tip height, T1, T2, T3, T7 and T8 · 200 m maximum blade tip height, T4, T5 and T6
- Stage
- Decided on 30 Apr 2026: S36 Raise Objection.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes a wind farm operating for 35 years, with 8 turbines, access tracks, an extension to a borrow pit, a substation, a control building and other supporting infrastructure. Turbines T1, T2, T3, T7 and T8 would have a maximum blade tip height of 180m; T4, T5 and T6 would reach 200m. The Energy Consents Unit will determine the application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/04141/S36?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/04141/S36. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Wind turbines would be erected, with maximum blade tip heights of 180m or 200m.
- 02
Access tracks and an extension to a borrow pit are proposed.
- 03
A substation, a control building and ancillary infrastructure are proposed.
Questions
Who will decide the application?
The Energy Consents Unit will determine it.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- House Extension
- Associated Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Section 36 Consent
- Substation
- Wind Turbine
- Wind Turbine Count 8
What each tag is based on
- Associated Infrastructure
- “access tracks, borrow pit extension, substation, control building, and ancillary infrastructure”
- House Extension
- “extension”
- Rail Infrastructure
- “Millenium Windfarm Glenmoriston”
- Railway Infrastructure
- “Millenium Windfarm Glenmoriston”
- Railway Station
- “Millenium Windfarm Glenmoriston”
- Section 36 Consent
- “25/04141/S36”
- Substation
- “substation”
- Wind Turbine
- “wind farm”, “8 wind turbines”
- Wind Turbine Count 8
- “total of 8 wind turbines”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 30 April 2026.
- Received30 Oct 2025
- Validated30 Oct 2025The council has everything it needs.
- Comments closed20 Nov 2025Usual deadline. Late comments may still count.
- Target decision30 Dec 20252-month target for local developments.
- Decision30 Apr 2026S36 Raise Objection.
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- HLD/25/04141/S36
- Address
- Millenium Windfarm Glenmoriston
- Status
- Awaiting decision
- Council decision
- S36 Raise Objection
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







