Planning applicationHLD/25/04141/S36

Millenium Windfarm Glenmoriston

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

30 October 2025

Validated

30 October 2025

Planning Signals

9 detected traits

Works
House Extension
Specific
Associated InfrastructureRail InfrastructureRailway InfrastructureRailway StationSection 36 Consent
Application Insights

No form insights available yet.

AI summary

Proposed Millennium East wind farm with up to 8 turbines (180200m tip height), access tracks, substation and control building for 35 years.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/04141/S36

Millenium Windfarm Glenmoriston

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived The Highland Council

Proposed Millennium East wind farm with up to 8 turbines (180200m tip height), access tracks, substation and control building for 35 years.

Reference
HLD/25/04141/S36
Address
Millenium Windfarm Glenmoriston
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.1423
Longitude
-4.8159

Plain-language summary

Proposed Millennium East wind farm with up to 8 turbines (180200m tip height), access tracks, substation and control building for 35 years.

As filed with the council

Millennium East Wind Farm - Erection and operation of a wind farm for a period of 35 years, comprising a total of 8 wind turbines with Turbines T1, T2, T3, T7 and T8 having a maximum blade tip height of 180m, and Turbines T4, T5 and T6 having a maximum blade tip height of 200m, access tracks, borrow pit extension, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00005013