Planning applicationHLD/25/04266/SCOP

Achkeepster Wind Farm Spittal

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

7 November 2025

Validated

7 November 2025

Planning Signals

4 detected traits

Specific
Eia ScopingWind Farm Micro Siting VariationWind TurbineWind Turbine Count 13 Or Up To 13
AI summary

Causeymire Wind Farm repowering proposes replacing existing turbines with 13 taller units (up to 200m blade-to-tip), with associated works.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/04266/SCOP

Achkeepster Wind Farm Spittal

DecidedRenewable Energy, EV & Heat PumpsReceived The Highland Council

Causeymire Wind Farm repowering proposes replacing existing turbines with 13 taller units (up to 200m blade-to-tip), with associated works.

Reference
HLD/25/04266/SCOP
Address
Achkeepster Wind Farm Spittal
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
7/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
58.4326
Longitude
-3.4535

Plain-language summary

Causeymire Wind Farm repowering proposes replacing existing turbines with 13 taller units (up to 200m blade-to-tip), with associated works.

As filed with the council

Causeymire Wind Farm Repowering - Replace the existing 21 turbines (in operation since 2004) with 13 wind turbines of 200m blade to tip height - Scoping Request