Planning application · HLD/25/04266/SCOP
13 wind turbines proposed to replace 21 at Causeymire Wind Farm.
Achkeepster Wind Farm Spittal
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Eia Scoping
- Wind Farm Micro Siting Variation
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
Overview
Why it’s worth watching
Scoping request for Causeymire Wind Farm Repowering, replacing 21 existing turbines in operation since 2004 with 13 turbines of 200m blade-tip height at Achkeepster Wind Farm, Spittal.
- Today
- 21 turbines, in operation since 2004
- Proposed
- Replace them with 13 wind turbines
- Size
- 21 turbines existing turbines · 13 turbines proposed turbines · 200 m proposed blade-tip height
- Stage
- Council responded on 16 Jan 2026: Scoping Application Decision Issued.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This scoping request concerns repowering Causeymire Wind Farm by replacing its existing turbines. It seeks to establish the scope of the assessment for the proposed scheme; it is not an application seeking permission to build the turbines.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/04266/SCOP?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/04266/SCOP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The proposal would replace the existing turbines with 13 wind turbines.
- 02
The proposed turbines would be 200m high to the blade tip.
Questions
What is a scoping request?
It asks for the scope of the assessment for a proposed development to be established. This request does not itself seek permission to build the turbines.
Tags
- Eia Scoping
- Wind Farm Micro Siting Variation
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
What each tag is based on
- Eia Scoping
- “Scoping Request”
- Wind Farm Micro Siting Variation
- “Repowering - Replace the existing 21 turbines”
- Wind Turbine
- “13 wind turbines”
- Wind Turbine Count 13 Or Up To 13
- “13 wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 16 January 2026.
- Received7 Nov 2025
- Validated7 Nov 2025The council has everything it needs.
- Comments closed28 Nov 2025Usual deadline. Late comments may still count.
- Target decision7 Jan 20262-month target for local developments.
- Decision16 Jan 2026Scoping Application Decision Issued.
The record
- Reference
- HLD/25/04266/SCOP
- Address
- Achkeepster Wind Farm Spittal
- Status
- Decided
- Council decision
- Scoping Application Decision Issued
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







