Application HLD/25/04604/FUL
Land 2KM NE Of The Lodge Buntait Glenurquhart Drumnadrochit
Cnoc Farasd wind farm proposed: up to 6 turbines (149.9m tip height), BESS and site infrastructure for up to 35 years.
The record
- Reference
- HLD/25/04604/FUL
- Address
- Land 2KM NE Of The Lodge Buntait Glenurquhart Drumnadrochit
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.3528
- Longitude
- -4.6386
What is proposed
Plain-language summary
Cnoc Farasd wind farm proposed: up to 6 turbines (149.9m tip height), BESS and site infrastructure for up to 35 years.
As filed with the council
Cnoc Farasd Wind Farm - Erection and operation of a wind farm for a period 35 years, comprising up to 6 turbines with a maximum blade tip height of 149.9 meters, battery energy storage system (BESS), and ancillary infrastructure