Planning application · HLD/25/04604/FUL
Wind farm of up to 6 turbines proposed near Drumnadrochit.
Land 2KM NE Of The Lodge Buntait Glenurquhart Drumnadrochit
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Wind Farm Micro Siting Variation
- Wind Turbine
Overview
Why it’s worth watching
A six-turbine wind farm with battery storage is a major energy infrastructure proposal with clear landscape and community consequences in Glenurquhart.
- Proposed
- A wind farm with up to 6 turbines, battery energy storage and supporting infrastructure
- Size
- 149.9 metres maximum blade tip height · 35 years proposed operating period · 7.7 kilometres distance west of Drumnadrochit
- Stage
- Past its target date of 4 Feb 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes Cnoc Farasd Wind Farm, with up to 6 turbines and a maximum blade tip height of 149.9 metres. It also includes a battery energy storage system and supporting infrastructure. The wind farm is proposed to operate for 35 years.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/04604/FUL?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/04604/FUL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
Wind turbines with a maximum blade tip height of 149.9 metres are proposed.
- 02
A battery energy storage system and supporting infrastructure are proposed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Wind Farm Micro Siting Variation
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “and ancillary infrastructure”
- Wind Farm Micro Siting Variation
- “Erection and operation of a wind farm”
- Wind Turbine
- “comprising up to 6 turbines”, “maximum blade tip height of 149.9 meters”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received2 Dec 2025
- Validated4 Dec 2025The council has everything it needs.
- Comments closed25 Dec 2025Usual deadline. Late comments may still count.
- Target decision (next)4 Feb 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- HLD/25/04604/FUL
- Address
- Land 2KM NE Of The Lodge Buntait Glenurquhart Drumnadrochit
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.