Planning applicationHLD/25/04632/FUL

The Tea House Bothy Coulin Estate Kinlochewe Achnasheen IV22 2ES

DecidedOutbuildings & Ancillary Structures
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

3 December 2025

Validated

26 January 2026

Planning Signals

1 detected trait

Specific
Outbuilding
AI summary

Plans show a replacement mountain bothy hut, with the existing small 3m-by-3m structure removed and a like-for-like timber shed rebuilt on site.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/04632/FUL

The Tea House Bothy Coulin Estate Kinlochewe Achnasheen IV22 2ES

DecidedOutbuildings & Ancillary StructuresReceived The Highland Council

Plans show a replacement mountain bothy hut, with the existing small 3m-by-3m structure removed and a like-for-like timber shed rebuilt on site.

Reference
HLD/25/04632/FUL
Address
The Tea House Bothy Coulin Estate Kinlochewe Achnasheen IV22 2ES
Status
Decided
Category
Outbuildings & Ancillary Structures
Impact scale
3/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.552254
Longitude
-5.338848

Plain-language summary

Plans show a replacement mountain bothy hut, with the existing small 3m-by-3m structure removed and a like-for-like timber shed rebuilt on site.

As filed with the council

Erection of replacement bothy