Planning applicationHLD/25/04642/SCOP

Land 2630M NE Of New Lodge Caplich Estate Caplich Lairg

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

4 December 2025

Validated

4 December 2025

Planning Signals

4 detected traits

Specific
Associated InfrastructureEia ScopingWind TurbineWind Turbine Count 29 Or Up To 29
AI summary

Proposed Fionn Wind Farm: up to 29 turbines (up to 250m blade tip) with associated infrastructure, power generation and decommissioning.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/25/04642/SCOP

Land 2630M NE Of New Lodge Caplich Estate Caplich Lairg

DecidedRenewable Energy, EV & Heat PumpsReceived The Highland Council

Proposed Fionn Wind Farm: up to 29 turbines (up to 250m blade tip) with associated infrastructure, power generation and decommissioning.

Reference
HLD/25/04642/SCOP
Address
Land 2630M NE Of New Lodge Caplich Estate Caplich Lairg
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.9974
Longitude
-4.7673

Plain-language summary

Proposed Fionn Wind Farm: up to 29 turbines (up to 250m blade tip) with associated infrastructure, power generation and decommissioning.

As filed with the council

Fionn Wind Farm - Generating station consisting of the erection, operation and subsequent decommissioning of up to 29 wind turbines (blade tip height up to 250m) and associated infrastructure