Planning application · HLD/25/04680/FUL
Biomass boiler and plant units at Dochcarty Industrial Estate.
Wood BlocX 7C Dochcarty Industrial Estate Dochcarty Road Dingwall IV15 9UG
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 5/10
- Ancillary Structure
- Biomass Energy
- Feed Silo
- Retrospective
Overview
- Proposed
- Biomass boiler with lean-to housing, hopper, air filter and plant units
- Type
- Full planning permission
- Stage
- Decided on 11 May 2026: Application Permitted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for a biomass boiler with lean-to housing, a hopper, and air filter and plant units. The works are described as retrospective, meaning the application seeks permission for works already carried out.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/04680/FUL?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/04680/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A biomass boiler with lean-to housing is proposed.
- 02
A hopper is proposed.
- 03
An air filter and plant units are proposed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Ancillary Structure
- Biomass Energy
- Feed Silo
- Retrospective
What each tag is based on
- Ancillary Structure
- “lean-to housing”, “air filter and plant units”
- Biomass Energy
- “Installation of biomass boiler”
- Feed Silo
- “erection of hopper”
- Retrospective
- “in retrospect”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 11 May 2026.
- Received8 Dec 2025
- Validated18 Dec 2025The council has everything it needs.
- Comments closed8 Jan 2026Usual deadline. Late comments may still count.
- Target decision18 Feb 20262-month target for local developments.
- Decision11 May 2026Application Permitted.
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- HLD/25/04680/FUL
- Address
- Wood BlocX 7C Dochcarty Industrial Estate Dochcarty Road Dingwall IV15 9UG
- Status
- Decided
- Council decision
- Application Permitted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 5/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Dingwall and Seaforth
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







