Planning application · HLD/25/04720/FUL
Bus gate, footpath and crossings proposed at Upper Achintore.
Land 230M NE Of 120 Lochaber Road Upper Achintore Fort William
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Parking, Access & Highways
- Small 3/10
- Accessibility
- Advertisement
- Bus Stop Infrastructure
- Pedestrian Infrastructure
- Road Layout
Overview
- Today
- A greenfield site with no use.
- Proposed
- A bus gate linking Lochaber Road and Aspen Wynd, with a footpath, crossings, road markings, signage and drainage works.
- Size
- 0.41 ha site area
- Stage
- Past its target date of 19 Mar 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes a bus gate linking Lochaber Road with a new housing development on Aspen Wynd. It also includes a footpath, tactile crossings, road markings, signage and drainage works. The application says the site is currently a greenfield field with no use.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/25/04720/FUL?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/25/04720/FUL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
A bus gate is proposed to link Lochaber Road with the housing development on Aspen Wynd.
- 02
The works include a footpath, tactile crossings, road markings and signage.
- 03
Drainage works are proposed.
- 04
The form says trees are on or next to the site but does not say whether any would be cut back or felled.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Advertisement
- Accessibility
- Bus Stop Infrastructure
- Pedestrian Infrastructure
- Road Layout
What each tag is based on
- Accessibility
- “tactile crossings”
- Advertisement
- “signage”, “Installation of Bus Gate, footpath, tactile crossings, road markings & signage”
- Bus Stop Infrastructure
- “Bus Gate”
- Pedestrian Infrastructure
- “footpath”, “tactile crossings”
- Road Layout
- “road markings”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received10 Dec 2025
- Validated19 Jan 2026The council has everything it needs.
- Comments closed9 Feb 2026Usual deadline. Late comments may still count.
- Target decision (next)19 Mar 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- HLD/25/04720/FUL
- Address
- Land 230M NE Of 120 Lochaber Road Upper Achintore Fort William
- Status
- Under Consideration
- Category
- Parking, Access & Highways
- Impact scale
- 3/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.