Application HLD/26/00090/FUL
Land South Of Loch Calder Water Treatment Works 270M NE Of Quarry Brae Braal Holdings Halkirk
Ground-mounted solar PV with 576 panels (337kW) proposed across the site to generate renewable electricity.
The record
- Reference
- HLD/26/00090/FUL
- Address
- Land South Of Loch Calder Water Treatment Works 270M NE Of Quarry Brae Braal Holdings Halkirk
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 58.5236
- Longitude
- -3.484
What is proposed
Plain-language summary
Ground-mounted solar PV with 576 panels (337kW) proposed across the site to generate renewable electricity.
As filed with the council
Installation of 576no. ground based PV panels with an output of 337KW