Planning applicationHLD/26/00391/S36

Glenmoriston Estate North Of Levishie Invermoriston

Under ConsiderationWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

30 January 2026

Validated

30 January 2026

Planning Signals

12 detected traits

Works
House Extension
Specific
Access RoadsAssociated InfrastructureBorrow PitRail InfrastructureRailway Infrastructure
Application Insights

No form insights available yet.

AI summary

Variation for Bhlaraidh Wind Farm, adding up to 15 turbines with blade tips up to 230m, plus access tracks, substation and control infrastructure.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/26/00391/S36

Glenmoriston Estate North Of Levishie Invermoriston

Under ConsiderationRenewable Energy, EV & Heat PumpsReceived The Highland Council

Variation for Bhlaraidh Wind Farm, adding up to 15 turbines with blade tips up to 230m, plus access tracks, substation and control infrastructure.

Reference
HLD/26/00391/S36
Address
Glenmoriston Estate North Of Levishie Invermoriston
Status
Under Consideration
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.2394
Longitude
-4.6972

Plain-language summary

Variation for Bhlaraidh Wind Farm, adding up to 15 turbines with blade tips up to 230m, plus access tracks, substation and control infrastructure.

As filed with the council

Bhlaraidh Wind Farm Extension - Section 36C - Proposed variation to Bhlaraidh Wind Farm Extension - comprising of 15 wind turbines with maximum blade tip height of upto 230m, access tracks, borrow pits, substation, control building and ancillary infrastructure 21/04080/S36). This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00006176