Planning application · HLD/26/00391/S36
Changes to approved wind farm extension with 15 turbines near Invermoriston.
Glenmoriston Estate North Of Levishie Invermoriston
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Access Roads
- Associated Infrastructure
- Borrow Pit
- House Extension
- Rail Infrastructure
Overview
Why it’s worth watching
Major renewable energy infrastructure variation with substantial scale and clear public interest, involving 15 turbines up to 230m and associated infrastructure.
- Today
- The neighbouring land is used for electricity generation at the operational Bhlaraidh Wind Farm.
- Proposed
- Changes to the approved extension, including taller turbines and related minor infrastructure changes.
- Size
- 15 turbines · 180 m to up to 230m maximum blade-tip height · 1,400 ha site area
- Stage
- Past its target date of 30 May 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This application seeks to change the already-consented Bhlaraidh Wind Farm Extension, approved under reference 21/04080/S36. It proposes to increase the turbines’ maximum blade-tip height from 180m to up to 230m, with related minor changes to infrastructure. The Energy Consents Unit will determine the application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/26/00391/S36?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/00391/S36. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
The turbines’ maximum blade-tip height would increase from 180m to up to 230m.
- 02
The description includes access tracks, borrow pits, a substation, a control building and ancillary infrastructure as part of the extension.
- 03
The form says public paths or public access would be affected, but gives no details of the changes.
Questions
What earlier permission does this application relate to?
It seeks changes to the Bhlaraidh Wind Farm Extension consent under reference 21/04080/S36.
Who will decide the application?
The Energy Consents Unit will determine it. The case gives reference ECU00006176 for searching its application records.
Was there earlier scoping work?
The form records a scoping response under reference 25/02050/SCOP.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- House Extension
- Access Roads
- Associated Infrastructure
- Borrow Pit
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Section 36 Consent
- Substation
- Wind Farm Micro Siting Variation
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
What each tag is based on
- Access Roads
- “access tracks”
- Associated Infrastructure
- “ancillary infrastructure”
- Borrow Pit
- “borrow pits”
- House Extension
- “extension”
- Rail Infrastructure
- “Glenmoriston Estate North Of Levishie Invermoriston”
- Railway Infrastructure
- “Glenmoriston Estate North Of Levishie Invermoriston”
- Railway Station
- “Glenmoriston Estate North Of Levishie Invermoriston”
- Section 36 Consent
- “Section 36C”
- Substation
- “substation”
- Wind Farm Micro Siting Variation
- “Variation”
- Wind Turbine
- “wind turbines”
- Wind Turbine Count 13 Or Up To 13
- “15 wind turbines”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received30 Jan 2026
- Validated30 Jan 2026The council has everything it needs.
- Comments closed20 Feb 2026Usual deadline. Late comments may still count.
- Target decision (next)30 May 20264-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- HLD/26/00391/S36
- Address
- Glenmoriston Estate North Of Levishie Invermoriston
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.