Planning applicationHLD/26/00531/S36

Land 5.8KM NE Of The Bothy Kildermorie Strathrusdale Alness

Under ConsiderationWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

6 February 2026

Validated

6 February 2026

Planning Signals

4 detected traits

Specific
Associated InfrastructureSection 36 ConsentWind TurbineWind Turbine Count 13 Or Up To 13
Application Insights

No form insights available yet.

AI summary

Creachan Wind Farm proposals include up to 13 turbines (tip heights around 180200m), BESS and associated infrastructure for up to 40 years.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/26/00531/S36

Land 5.8KM NE Of The Bothy Kildermorie Strathrusdale Alness

Under ConsiderationRenewable Energy, EV & Heat PumpsReceived The Highland Council

Creachan Wind Farm proposals include up to 13 turbines (tip heights around 180200m), BESS and associated infrastructure for up to 40 years.

Reference
HLD/26/00531/S36
Address
Land 5.8KM NE Of The Bothy Kildermorie Strathrusdale Alness
Status
Under Consideration
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.7978
Longitude
-4.4636

Plain-language summary

Creachan Wind Farm proposals include up to 13 turbines (tip heights around 180200m), BESS and associated infrastructure for up to 40 years.

As filed with the council

Creachan Wind Farm - Erection and Operation of a Wind Farm for up to 40 years comprising up to 13 wind turbines, 9 with a maximum blade tip height of 200m and 4 with a maximum blade tip height of 180m, battery energy storage system (BESS), and associated infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00005211