Planning applicationHLD/26/00601/S36

Land 1.5KM South Of 2 Easter Kilmachalmack Strathkyle Ardgay

Under ConsiderationWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

10 February 2026

Validated

10 February 2026

Planning Signals

9 detected traits

Specific
Access RoadsAssociated InfrastructureBorrow PitRail InfrastructureRailway InfrastructureRailway Station
Application Insights

No form insights available yet.

AI summary

Erection of an Inveroykel wind farm: up to 20 turbines (blade tip height up to 230m) with BESS, substation and access tracks for 40 years.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/26/00601/S36

Land 1.5KM South Of 2 Easter Kilmachalmack Strathkyle Ardgay

Under ConsiderationRenewable Energy, EV & Heat PumpsReceived The Highland Council

Erection of an Inveroykel wind farm: up to 20 turbines (blade tip height up to 230m) with BESS, substation and access tracks for 40 years.

Reference
HLD/26/00601/S36
Address
Land 1.5KM South Of 2 Easter Kilmachalmack Strathkyle Ardgay
Status
Under Consideration
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.9277
Longitude
-4.5493

Plain-language summary

Erection of an Inveroykel wind farm: up to 20 turbines (blade tip height up to 230m) with BESS, substation and access tracks for 40 years.

As filed with the council

Inveroykel Wind Farm - Erection and Operation of a Wind Farm for a period of 40 years, comprising of 20 Wind Turbines with a maximum blade tip height 230m, battery energy storage system (BESS), access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00005210