Planning applicationHLD/26/00739/SCOP

Land 2430M SW Of Loch Buidhe Bonar Bridge

DecidedWorth watchingNew-Build & Major Development
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

10 February 2026

Validated

10 February 2026

Planning Signals

5 detected traits

Works
Demolition
Specific
Eia ScopingKilovolt Voltage Category 33kv Overhead LineOverhead Utility LinesSubstation
AI summary

EIA scoping for a new 132kV overhead line linking Shin to a cable sealing compound near Loch Buidhe, with removal of the existing line.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/26/00739/SCOP

Land 2430M SW Of Loch Buidhe Bonar Bridge

DecidedNew-Build & Major DevelopmentReceived The Highland Council

EIA scoping for a new 132kV overhead line linking Shin to a cable sealing compound near Loch Buidhe, with removal of the existing line.

Reference
HLD/26/00739/SCOP
Address
Land 2430M SW Of Loch Buidhe Bonar Bridge
Status
Decided
Category
New-Build & Major Development
Impact scale
7/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.9475
Longitude
-4.3773

Plain-language summary

EIA scoping for a new 132kV overhead line linking Shin to a cable sealing compound near Loch Buidhe, with removal of the existing line.

As filed with the council

EIA Scoping Request for the construction and operation of a new 132kV overhead line (OHL) connection between Shin Substation and a proposed cable sealing end (CSE) compound approximately 2 km west of Loch Buidhe Substation, and the dismantling of the existing 132kV OHL connection between Shin Substation and Loch Buidhe Substation