EIA required for a change to the consented Bhlaraidh grid connection.
Land 95M SE Of Dundreggan Dam Glenmoriston
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Telecommunications
- Medium 5/10
- Eia Screening
- House Extension
- Overhead Utility Lines
- Wind Turbine
Overview
Why it’s worth watching
EIA screening for a technical design change to a consented wind farm grid connection is a specific infrastructure change with supporting screening documents.
- Today
- A grid connection for the Bhlaraidh Extension Wind Farm is consented.
- Proposed
- A technical design change involving a section of overhead line is being screened.
- Size
- 1.4 km overhead line section · 132 kV voltage
- Stage
- Council responded on 20 May 2026: Screening Application EIA Required.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application asks whether a technical design change to the consented Bhlaraidh Extension Wind Farm Grid Connection needs an Environmental Impact Assessment (EIA), a study of likely environmental effects. The screening outcome says an EIA is required. The earlier application is ECU00004639.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/26/01590/SCRE?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/01590/SCRE. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The design change involves a 1.4km section of overhead line.
Questions
What does the screening outcome mean?
The outcome says an Environmental Impact Assessment is required. It is a screening decision, not a decision on whether the design change is approved.
Which earlier application is linked?
The description identifies the consented grid connection as ECU00004639.
Tags
- House Extension
- Eia Screening
- Overhead Utility Lines
- Wind Turbine
What each tag is based on
- Eia Screening
- “EIA Screening Opinion”
- House Extension
- “extension”
- Overhead Utility Lines
- “132kV overhead line”
- Wind Turbine
- “Bhlaraidh Extension Wind Farm”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 20 May 2026.
- Received14 Apr 2026
- Validated14 Apr 2026The council has everything it needs.
- Comments closed5 May 2026Usual deadline. Late comments may still count.
- Target decision14 Jun 20262-month target for local developments.
- Decision20 May 2026Screening Application EIA Required.
The record
- Reference
- HLD/26/01590/SCRE
- Address
- Land 95M SE Of Dundreggan Dam Glenmoriston
- Status
- Awaiting decision
- Council decision
- Screening Application EIA Required
- Decision issued
- Category
- Telecommunications
- Impact scale
- 5/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.