Grid stability facility with synchronous condenser/flywheel, control building and switchgear, SuDS drainage and lighting, plus underground high-voltage cable to Thurso South substation.
The record
- Reference
- HLD/26/02214/SCRE
- Address
- Land 570M NW Of Shalmstry Thurso
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- The Highland Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 58.5626
- Longitude
- -3.5065
What is proposed
Plain-language summary
Grid stability facility with synchronous condenser/flywheel, control building and switchgear, SuDS drainage and lighting, plus underground high-voltage cable to Thurso South substation.
As filed with the council
Erection of a grid stability facility (synchronous condenser and flywheel) and associated infrastructure, including control building, transformers, switchgear, access, parking, boundary enclosures, drainage (including SuDS), lighting and landscaping, together with an associated high voltage underground cable connection to Thurso South Substation.