Skip to content

Planning application · HLD/26/03624/S36

HLD/26/03624/S36Under considerationWorth watching

Changes to approved 14-turbine Tomchrasky Wind Farm.

Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston

The Highland Council

Email me when it’s decided

£1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Large 8/10
Tags
  • Associated Infrastructure
  • Rail Infrastructure
  • Railway Infrastructure
  • Section 36 Consent
  • Wind Farm Micro Siting Variation

Overview

Why it’s worth watching

This is a consequential live variation to a major Highland energy project: it would materially change turbine scale and operating life, with documented landscape, community and abnormal-load implications, while related CityScope records show a wider Bingally grid-infrastructure cluster. The decision is not yet established.

Today
Approved blade tip height: 185m; operational lifetime: 30 years
Proposed
Blade tip height: 250m; operational lifetime: 40 years
Size
14 turbines turbines in approved scheme · 185 m to 250m blade tip height
Stage
Past its target date of 21 Oct 2026.

The council writes only to properties within 20 metres of an application site. Who is told

Eiar volume 4b visualisations figure 6-8a-b - viewpoint ch-35 balnacarn township

In plain English

This application seeks to change the approved Tomchrasky Wind Farm scheme, reference 22/05955/S36. It proposes increasing the blade tip height from 185m to 250m and extending the operational lifetime from 30 years to 40 years. The approved scheme comprises 14 turbines and associated infrastructure.

Written with AI from the application form and the council record.

Read our story

Tomchrasky wind farm plan would bring taller turbines and a longer operating life

A live variation would raise Tomchrasky's proposed maximum blade tip height from 185 metres to 250 metres and extend the operating life from 30 years to 40 years. Separate Highland records show related Bingally grid proposals, with one screening opinion already requiring a full environmental assessment for any future consent application.

City Scope Journal →

Keep reading

Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

Track this application

How do I track planning application HLD/26/03624/S36?

Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/03624/S36. City Scope can email you when this application is decided. To comment on the application, use the Highland Council planning portal.

Get an email when this application is decided