Planning application · HLD/26/03624/S36
Changes to approved 14-turbine Tomchrasky Wind Farm.
Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston
£1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Section 36 Consent
- Wind Farm Micro Siting Variation
Overview
Why it’s worth watching
This is a consequential live variation to a major Highland energy project: it would materially change turbine scale and operating life, with documented landscape, community and abnormal-load implications, while related CityScope records show a wider Bingally grid-infrastructure cluster. The decision is not yet established.
- Today
- Approved blade tip height: 185m; operational lifetime: 30 years
- Proposed
- Blade tip height: 250m; operational lifetime: 40 years
- Size
- 14 turbines turbines in approved scheme · 185 m to 250m blade tip height
- Stage
- Past its target date of 21 Oct 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This application seeks to change the approved Tomchrasky Wind Farm scheme, reference 22/05955/S36. It proposes increasing the blade tip height from 185m to 250m and extending the operational lifetime from 30 years to 40 years. The approved scheme comprises 14 turbines and associated infrastructure.
Written with AI from the application form and the council record.
Read our story
Tomchrasky wind farm plan would bring taller turbines and a longer operating life
A live variation would raise Tomchrasky's proposed maximum blade tip height from 185 metres to 250 metres and extend the operating life from 30 years to 40 years. Separate Highland records show related Bingally grid proposals, with one screening opinion already requiring a full environmental assessment for any future consent application.
City Scope Journal →Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/26/03624/S36?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/03624/S36. City Scope can email you when this application is decided. To comment on the application, use the Highland Council planning portal.
Get an email when this application is decidedOn the street
What neighbours would notice.
- 01
The proposed blade tip height would increase from 185m to 250m.
- 02
The proposed operational lifetime would increase from 30 years to 40 years.
Questions
Which approved scheme does this application relate to?
Tomchrasky Wind Farm, reference 22/05955/S36.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Section 36 Consent
- Wind Farm Micro Siting Variation
- Wind Turbine
- Wind Turbine Count 14
What each tag is based on
- Associated Infrastructure
- “access tracks, four borrow pits, and associated infrastructure”
- Rail Infrastructure
- “Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston”
- Railway Infrastructure
- “Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston”
- Section 36 Consent
- “26/03624/S36”, “consent for Tomchrasky Wind Farm (THC ref. 22/05955/S36)”
- Wind Farm Micro Siting Variation
- “Tomchrasky Wind Farm Variation - application to increase the blade tip height”
- Wind Turbine
- “Tomchrasky Wind Farm Variation”, “14 turbines”
- Wind Turbine Count 14
- “comprising 14 turbines”
As lodged
The drawings.




All documents (4)
- Eiar volume 4b visualisations figure 6-8a-b - viewpoint ch-35 balnacarn township
- Eiar volume 4b visualisations figure 6-7a-d - viewpoint ch-10 glenmoriston ceann
- Eiar volume 4b visualisations figure 6-9a-b - viewpoint ch-36 tir nan og cairn
- Eiar volume 4b visualisations figure 6-7a-d - viewpoint ch-10 glenmoriston ceann
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received21 Aug 2026
- Validated21 Aug 2026The council has everything it needs.
- Comments closed11 Sept 2026Usual deadline. Late comments may still count.
- Target decision (next)21 Oct 20262-month target for local developments.
- DecisionNot yet
The record
- Reference
- HLD/26/03624/S36
- Address
- Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston
- Status
- Under Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.