Planning applicationHLD/26/03624/S36

Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston

Under ConsiderationWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

21 August 2026

Validated

21 August 2026

Planning Signals

7 detected traits

Specific
Associated InfrastructureRail InfrastructureRailway InfrastructureSection 36 ConsentWind Farm Micro Siting VariationWind Turbine
Application Insights

No form insights available yet.

AI summary

Variation to increase turbine blade tip height from 185m to 250m and extend operational life to 40 years for Tomchrasky Wind Farm.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/26/03624/S36

Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston

Under ConsiderationRenewable Energy, EV & Heat PumpsReceived The Highland Council

Variation to increase turbine blade tip height from 185m to 250m and extend operational life to 40 years for Tomchrasky Wind Farm.

Reference
HLD/26/03624/S36
Address
Land 3200M NW Of Dalchreichart Cemetery Dalchreichart Glenmoriston
Status
Under Consideration
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.1738
Longitude
-4.9297

Plain-language summary

Variation to increase turbine blade tip height from 185m to 250m and extend operational life to 40 years for Tomchrasky Wind Farm.

As filed with the council

Tomchrasky Wind Farm Variation - application to increase the blade tip height from 185m to 250m and extend the operational lifetime from 30 years 40 years of the consent for Tomchrasky Wind Farm (THC ref. 22/05955/S36) comprising 14 turbines, battery energy storage system (BESS), anemometer mast, access tracks, four borrow pits, and associated infrastructure.

City Scope Journal

Tomchrasky wind farm plan would bring taller turbines and a longer operating life

A live variation would raise Tomchrasky's proposed maximum blade tip height from 185 metres to 250 metres and extend the operating life from 30 years to 40 years. Separate Highland records show related Bingally grid proposals, with one screening opinion already requiring a full environmental assessment for any future consent application.

Read the Journal article →