Planning application · HLD/26/03769/S36
Wind farm of up to 12 turbines proposed near Forsinard.
Land 2400M SE Of Forsinain Forsinard
£1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Major 9/10
- Access Roads
- Associated Infrastructure
- Borrow Pit
- Met Mast
- Rail Infrastructure
Overview
Why it’s worth watching
The current proposal is large and long-term, and a recent formal forestry response identifies a specific trade-off between permanent woodland removal and peatland restoration while objecting pending further information. The case remains under consideration; this is a strong reader interest signal, not evidence of consent or environmental effects.
- Proposed
- A wind farm with up to 12 turbines, access tracks, borrow pits, a substation, a control building, an anemometer mast and ancillary infrastructure.
- Size
- 219 m or 206m maximum blade tip height · 40 years operating period
- Stage
- Comments closed. Decision due by 28 Dec 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes a wind farm for up to 40 years, with up to 12 turbines and related infrastructure. The turbines would have maximum blade tip heights of 219m or 206m. The Energy Consents Unit will determine the application.
Written with AI from the application form and the council record.
Read our story
Forsinain Forest wind farm proposal sets out 219m turbines
The 40-year proposal lists ten turbines with blade tips up to 219m and two up to 206m. The Energy Consents Unit will decide the case.
City Scope Journal →Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/26/03769/S36?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/03769/S36. City Scope can email you when this application is decided. To comment on the application, use the Highland Council planning portal.
Get an email when this application is decidedOn the street
What neighbours would notice.
- 01
The proposal includes access tracks, borrow pits, a substation, a control building, an anemometer mast and ancillary infrastructure.
Questions
Who will determine the application?
The Energy Consents Unit will determine it.
Where can I find the application?
The record directs readers to the Energy Consents Unit website, using reference ECU00004935.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Access Roads
- Associated Infrastructure
- Borrow Pit
- Met Mast
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Section 36 Consent
- Substation
- Wind Turbine
What each tag is based on
- Access Roads
- “access tracks”
- Associated Infrastructure
- “ancillary infrastructure”
- Borrow Pit
- “borrow pits”
- Met Mast
- “anemometer mast”
- Rail Infrastructure
- “Land 2400M SE Of Forsinain Forsinard”
- Railway Infrastructure
- “Land 2400M SE Of Forsinain Forsinard”
- Railway Station
- “Land 2400M SE Of Forsinain Forsinard”
- Section 36 Consent
- “26/03769/S36”, “This case will be determined by the Energy Consents Unit.”
- Substation
- “substation”
- Wind Turbine
- “up to 12 wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 28 December.
- Received27 Aug 2026
- Validated28 Aug 2026The council has everything it needs.
- Comments closed18 Sept 2026Usual deadline. Late comments may still count.
- Target decision (next)28 Dec 20264-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- HLD/26/03769/S36
- Address
- Land 2400M SE Of Forsinain Forsinard
- Status
- Under Consideration
- Category
- New-Build & Major Development
- Impact scale
- 9/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.