Planning applicationHLD/26/03962/PAN

Land 1.25 KM SW Of Garvary Bonar Bridge

Under ConsiderationNew-Build & Major Development
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

9 September 2026

Validated

17 September 2026

Planning Signals

9 detected traits

Specific
Eia ScopingElectrical InfrastructureRail InfrastructureRailway InfrastructureRailway StationSubstation Connection Works
Application Insights

No form insights available yet.

AI summary

Proposed 5.79 km underground 132 kV cable, temporary tracks, compound and reinstatement.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/26/03962/PAN

Land 1.25 KM SW Of Garvary Bonar Bridge

Under ConsiderationNew-Build & Major DevelopmentReceived The Highland Council

Proposed 5.79 km underground 132 kV cable, temporary tracks, compound and reinstatement.

Reference
HLD/26/03962/PAN
Address
Land 1.25 KM SW Of Garvary Bonar Bridge
Status
Under Consideration
Category
New-Build & Major Development
Impact scale
8/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.8918044
Longitude
-4.3463741

Plain-language summary

Proposed 5.79 km underground 132 kV cable, temporary tracks, compound and reinstatement.

As filed with the council

Construction and operation of a 132 kilovolt (kV) underground cable, approximately 5.79 km in length, between the proposed Garvary Wind Farm substation and the existing Loch Buidhe substation, south of Lairg, Scottish Highlands. Associated works comprise works within the operational footprint of Loch Buidhe substation to facilitate the new 132 kV connection, construction of temporary access tracks and/or upgrade to existing tracks, temporary construction compound, and reinstatement of underground cable construction corridor.