Planning application · HLD/26/03962/PAN
Underground cable proposed between Garvary and Loch Buidhe substations.
Land 1.25 KM SW Of Garvary Bonar Bridge
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Large 8/10
- Eia Scoping
- Electrical Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
Overview
- Proposed
- An underground cable and associated temporary works
- Size
- 132 kilovolt (kV) cable voltage
- Stage
- Past its target date of 17 Nov 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks planning permission in principle for an underground 132 kilovolt cable between the proposed Garvary Wind Farm substation and the existing Loch Buidhe substation, south of Lairg. The proposal includes work within the Loch Buidhe substation’s operational footprint, temporary access tracks or upgrades to existing tracks, a temporary construction compound and reinstatement of the cable construction corridor.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/26/03962/PAN?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/03962/PAN. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
Temporary access tracks would be built and/or existing tracks upgraded.
- 02
A temporary construction compound is proposed.
- 03
The underground cable construction corridor would be reinstated.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Eia Scoping
- Electrical Infrastructure
- Rail Infrastructure
- Railway Infrastructure
- Railway Station
- Substation Connection Works
- Temporary Access Road
- Temporary Construction Compound
- Underground Cable Route Works
What each tag is based on
- Eia Scoping
- “reference_no: 26/03962/PAN”
- Electrical Infrastructure
- “132 kilovolt (kV) underground cable”
- Rail Infrastructure
- “Land 1.25 KM SW Of Garvary Bonar Bridge”
- Railway Infrastructure
- “Land 1.25 KM SW Of Garvary Bonar Bridge”
- Railway Station
- “Land 1.25 KM SW Of Garvary Bonar Bridge”
- Substation Connection Works
- “between the proposed Garvary Wind Farm substation and the existing Loch Buidhe substation”
- Temporary Access Road
- “construction of temporary access tracks and/or upgrade to existing tracks”
- Temporary Construction Compound
- “temporary construction compound”
- Underground Cable Route Works
- “Construction and operation of a 132 kilovolt (kV) underground cable, approximately 5.79 km in length”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received9 Sept 2026
- Validated17 Sept 2026The council has everything it needs.
- Comments closed8 Oct 2026Usual deadline. Late comments may still count.
- Target decision (next)17 Nov 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Proposal of application notice
- Notice that a major application is coming. The developer must consult the public for at least 12 weeks first.
The record
- Reference
- HLD/26/03962/PAN
- Address
- Land 1.25 KM SW Of Garvary Bonar Bridge
- Status
- Under Consideration
- Category
- New-Build & Major Development
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.