Planning application · HLD/26/04258/PAN
132 kV grid connection proposed near Grantown-on-Spey.
Land 2265M East Of Dava Farm Cottage Grantown-on-spey
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Large 7/10
- Electrical Infrastructure
- Proposal Of Application Notice
- Substation Connection Works
- Utility Line Route Corridor
Overview
Why it’s worth watching
Major grid connection infrastructure proposal between Clash Gour Collector and Ourack substations awaiting determination.
- Proposed
- A single-circuit connection operating at 132 kilovolts.
- Size
- 132 kilovolt (kV) connection voltage
- Stage
- Comments closed. Decision due by 25 Nov 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for the erection and operation of a single-circuit grid connection between the proposed Clash Gour Collector substation and the consented Ourack substation. A kilovolt is a unit of electrical voltage.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/26/04258/PAN?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/04258/PAN. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
Erection work is proposed for the grid connection; the application description does not say what construction work would involve.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Electrical Infrastructure
- Proposal Of Application Notice
- Substation Connection Works
- Utility Line Route Corridor
What each tag is based on
- Electrical Infrastructure
- “132 kilovolt (kV) single circuit connection”
- Proposal Of Application Notice
- “26/04258/PAN”
- Substation Connection Works
- “connection between the proposed Clash Gour Collector 275/132 kV Substation and the consented Ourack 132/33 kV substation”
- Utility Line Route Corridor
- “single circuit connection”
All documents (1)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 25 November.
- Received25 Sept 2026
- Validated25 Sept 2026The council has everything it needs.
- Comments closed16 Oct 2026Usual deadline. Late comments may still count.
- Target decision (next)25 Nov 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Proposal of application notice
- Notice that a major application is coming. The developer must consult the public for at least 12 weeks first.
The record
- Reference
- HLD/26/04258/PAN
- Address
- Land 2265M East Of Dava Farm Cottage Grantown-on-spey
- Status
- Under Consideration
- Category
- New-Build & Major Development
- Impact scale
- 7/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.