Planning applicationHLD/26/04258/PAN

Land 2265M East Of Dava Farm Cottage Grantown-on-spey

Under ConsiderationWorth watchingNew-Build & Major Development
Official records · coverage in progress

2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.

Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
Received

25 September 2026

Validated

25 September 2026

Planning Signals

4 detected traits

Specific
Electrical InfrastructureProposal Of Application NoticeSubstation Connection WorksUtility Line Route Corridor
Application Insights

No form insights available yet.

AI summary

Proposed 132kV single circuit grid connection between Clash Gour Collector and Ourack substations.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application HLD/26/04258/PAN

Land 2265M East Of Dava Farm Cottage Grantown-on-spey

Under ConsiderationNew-Build & Major DevelopmentReceived The Highland Council

Proposed 132kV single circuit grid connection between Clash Gour Collector and Ourack substations.

Reference
HLD/26/04258/PAN
Address
Land 2265M East Of Dava Farm Cottage Grantown-on-spey
Status
Under Consideration
Category
New-Build & Major Development
Impact scale
7/10
Authority
The Highland Council
Received
Validated
Last scraped
Record created
Latitude
57.4777
Longitude
-3.6059

Plain-language summary

Proposed 132kV single circuit grid connection between Clash Gour Collector and Ourack substations.

As filed with the council

Ourack Wind Farm Grid Connection - Erection and operation of a 132 kilovolt (kV) single circuit connection between the proposed Clash Gour Collector 275/132 kV Substation and the consented Ourack 132/33 kV substation