Scoping opinion sought for changes to Beauly–Denny overhead line.
Land 2KM SE Of Faegour Cottage Kinloch Laggan
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Legal / Administrative
- Medium 5/10
- Eia Scoping
- Overhead Utility Lines
- Section 37 Consent
- Utility Line Route Corridor
Overview
Why it’s worth watching
A major infrastructure scoping request for 400kV transmission reconfiguration linked to pumped storage hydro, with materials documenting the environmental assessment scope.
- Today
- Existing Beauly–Denny 400 kV overhead line
- Proposed
- Reconfiguration of the existing overhead line
- Size
- 400 kV existing overhead line
- Stage
- Comments closed. Decision due by 9 Dec 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application asks The Highland Council for a scoping opinion for a proposed Section 37 application. A scoping opinion advises what environmental issues an assessment should cover. The proposed application would reconfigure the existing Beauly–Denny overhead line as part of the Coire Mashie Substation and Earba Pumped Storage Hydro grid connection project.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/26/04466/SCOP?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/04466/SCOP. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Highland Council planning portal.
On the street
What neighbours would notice.
- 01
The proposal concerns reconfiguration of the existing Beauly–Denny overhead line.
Questions
What is a scoping opinion?
It advises what environmental issues should be covered in an assessment for a proposed project.
Tags
- Eia Scoping
- Overhead Utility Lines
- Section 37 Consent
- Utility Line Route Corridor
What each tag is based on
- Eia Scoping
- “Request for scoping opinion”
- Overhead Utility Lines
- “reconfiguration of the existing Beauly - Denny 400kv overhead line”
- Section 37 Consent
- “proposed Section 37 application”
- Utility Line Route Corridor
- “reconfiguration of the existing Beauly - Denny 400kv overhead line”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 9 December.
- Received9 Oct 2026
- Validated9 Oct 2026The council has everything it needs.
- Comments closed30 Oct 2026Usual deadline. Late comments may still count.
- Target decision (next)9 Dec 20262-month target for local developments.
- DecisionNot yet
The record
- Reference
- HLD/26/04466/SCOP
- Address
- Land 2KM SE Of Faegour Cottage Kinloch Laggan
- Status
- Under Consideration
- Category
- Legal / Administrative
- Impact scale
- 5/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.