Planning application · HLD/26/04572/SCRE
Screening request for Skulamus electricity scheme withdrawn.
Skulamus Substation Breakish
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Large 8/10
- Eia Screening
- Electricity Distribution Voltage Upgrade 11kv
- Kilovolt Voltage Category 33kv Overhead Line
- Overhead Utility Lines
- Substation
Overview
Why it’s worth watching
A withdrawn EIA screening request describes a major electricity reinforcement across Skye with 20km of new 33kV overhead line, a substation replacement and a new switchroom, a substantial infrastructure change with clear local relevance.
- Proposed
- Substation replacement, a new switchroom, overhead lines and underground cables
- Size
- 20 km at 33kV new overhead line
- Stage
- Decided: Withdrawn.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application asked The Highland Council for an EIA screening opinion: a view on whether an Environmental Impact Assessment is needed. The scheme description includes replacing the Skulamus Substation, a new switchroom at Broadford Substation, overhead lines and underground cables. The application is recorded as withdrawn.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
2,581 of 2,786 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 205 records from that period are still being added or checked.
Proposals and decisions come from The Highland Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application HLD/26/04572/SCRE?
Follow it on City Scope. This page is checked against the Highland Council planning register and shows the latest status, decision and documents for HLD/26/04572/SCRE. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Highland Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The Skulamus Substation would be replaced.
- 02
A new 33kV switchroom would be installed at Broadford Substation.
- 03
A new 20km overhead line would run between Skulamus Substation and Kilbeg.
- 04
Underground cable works are described between Skulamus and Broadford, and between Broadford and Kilbeg; existing cable between Broadford and Skulamus would be overlaid.
Questions
What is an EIA screening opinion?
It is a view on whether a proposed scheme needs an Environmental Impact Assessment.
Does this record say whether the scheme will go ahead?
No. It records the screening request as withdrawn.
Tags
- Eia Screening
- Electricity Distribution Voltage Upgrade 11kv
- Kilovolt Voltage Category 33kv Overhead Line
- Overhead Utility Lines
- Substation
- Switch Room
- Underground Electrical Cabling
What each tag is based on
- Eia Screening
- “EIA Screening Opinion Request”
- Electricity Distribution Voltage Upgrade 11kv
- “11kV underground cable (UGC)”
- Kilovolt Voltage Category 33kv Overhead Line
- “20km of new 33kV overhead line (OHL)”
- Overhead Utility Lines
- “20km of new 33kV overhead line (OHL)”
- Substation
- “replacement of Sulamus Substation”
- Switch Room
- “installation of a new 33kV switchroom at Broadford Substation”
- Underground Electrical Cabling
- “11kV underground cable (UGC) between Skulamus Substation and Broadford”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received12 Oct 2026
- Validated12 Oct 2026The council has everything it needs.
- Comments closed2 Nov 2026Usual deadline. Late comments may still count.
- Target decision12 Dec 20262-month target for local developments.
- DecisionWithdrawn
The record
- Reference
- HLD/26/04572/SCRE
- Address
- Skulamus Substation Breakish
- Status
- Withdrawn
- Category
- New-Build & Major Development
- Impact scale
- 8/10
- Authority
- The Highland Council
- Received
- Validated
- Last checked
- Added to City Scope