Skip to content

Planning application · HOUNSLOW/PA/2026/1127

HOUNSLOW/PA/2026/1127Approved

Proposed rooftop solar PV system of about 20 kWp (46 panels) on existing roofs, with mounting frames, cabling and inverters at Girling Way.

Units 5 and 6, Girling Way, Feltham, TW14 0PH

Bedfont ward · Hounslow

Category
Renewable Energy, EV & Heat Pumps
Scale
Small 3/10

Overview

As lodged with the council

1. Description of Proposed Development Installation of a rooftop mounted solar photovoltaic (PV) system with a total capacity of approximately 20 kWp (10kWp per unit) (comprising 46 x 450W panels) on the roofs of Unit 5 & 6, South Cargo, Girling Way, Heathrow, TW14 0PH The proposal comprises the installation of solar PV panels mounted to the existing roof structure, together with associated mounting frames, cabling, inverter equipment and ancillary electrical infrastructure. No external alterations to the building are proposed beyond the installation of the solar PV equipment. 2. Compliance with Schedule 2, Part 14, Class J This submission has been prepared with regard to Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). The proposed development accords with the relevant limitations and conditions of Class J, including: The solar equipment will not protrude more than 200mm beyond the plane of the roof slope. The highest part of the solar equipment will not exceed the highest part of the existing roof (excluding chimneys). The equipment will be sited so far as practicable to minimise its effect on the external appearance of the building and the amenity of the area. The installation will be removed as soon as reasonably practicable when no longer required. The layout has been arranged to respect appropriate setback distances from roof edges and rooflights, including: A minimum setback of 1.5m from building edges. A minimum clearance of 1.2m from skylights and roof penetrations. The system has been designed so that it does not exceed the structural load capacity of the existing roof. 3. Visual and Amenity Considerations The solar panels to be installed are dark blue/black in colour, incorporate anti-glare coating and are non-reflective in nature. The panels are static, contain no moving parts and will not generate noise. The development will not materially alter the appearance of the building or restrict its use in any way. The proposal has been developed to minimise visual impact on the building and surrounding area. 4. Environmental Benefits The installation of the solar PV system will reduce carbon emissions associated with the building and contribute to the decarbonisation of the site’s operational energy use. The system will be installed by a government certified (MCS) solar PV engineering contractor with experience in delivering comparable commercial rooftop installations. 5. Submission Requirements In accordance with the requirements of Class J, this submission includes: A written description of the proposed development A plan indicating the site and showing the proposed development The developer’s contact address The developer’s email address for electronic correspondence

The headline is a plain-English summary written with AI from the council record.

Keep reading

Track this application

How do I track planning application HOUNSLOW/PA/2026/1127?

Follow it on City Scope. This page is checked against the Hounslow planning register and shows the latest status, decision and documents for HOUNSLOW/PA/2026/1127. To comment on the application, use the Hounslow planning portal.