Planning application · ISLINGTON/P2026/0969/FUL
Erection of a timber treehouse with elevated decked platform, rope bridge, smaller platform and cargo net at a children's centre at Blackstock Road.
Ambler Primary School, 80, Blackstock Road, London, N4 2DR
- Outbuildings & Ancillary Structures
- Small 3/10
Overview
- Type
- Full planning permission
- Stage
- Past its target date of 18 Jun 2026.
As lodged with the council
We are proposing to create a treehouse in the outdoor area of Ambler Children’s Centre, which we call ‘the Forest’. Although we are fortunate to have the space, it is in need of renovation to ensure it continues to meet the needs of our pupils and meet health and safety requirements. The treehouse will provide a unique, elevated space that encourages exploration, curiosity, and creativity. It is designed to blend with the natural environment and will become a focal point for outdoor learning. The treehouse will support the delivery of the EYFS statutory framework and children’s personal, social, emotional and physical development. It will be a standalone structure constructed using pressure treated timber, supported by 100mm poles concreted into the ground. The roof will be clad with cedar shingles to blend with the existing natural environment. The design comprises an elevated decked platform with the treehouse in one corner and a rope bridge to a smaller wooden platform. The smaller platform will have a cargo net to ground level and the larger decking area is accessed by stairs. Please refer to section 7 supplementary information for details of proposed location and dimensions of treehouse.
The headline is a plain-English summary written with AI from the council record.
Keep reading
Track this application
How do I track planning application ISLINGTON/P2026/0969/FUL?
Follow it on City Scope. This page is checked against the Islington planning register and shows the latest status, decision and documents for ISLINGTON/P2026/0969/FUL. To comment on the application, use the Islington planning portal.
The impact
What it involves.
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Validated23 Apr 2026The council has everything it needs.
- Comments closed14 May 2026Usual deadline. Late comments may still count.
- Target decision (next)18 Jun 20268-week target for minor and other applications.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- ISLINGTON/P2026/0969/FUL
- Address
- Ambler Primary School, 80, Blackstock Road, London, N4 2DR
- Status
- Application Under Consideration
- Category
- Outbuildings & Ancillary Structures
- Impact scale
- 3/10
- Authority
- Islington
- Validated
- Last checked
- Added to City Scope
- Ward
- Finsbury Park
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.
